UP-RERA Property Intelligence Report

Mahagun Mantra II

HEBE INFRASTRUCTURE PRIVATE LIMITED (MAHAGUN GROU · Gautam Buddha Nagar · UP-RERA UPRERAPRJ1870

What this report covers

Full report — filing record + unit-level plan intelligence

This report covers:

  • the official UP-RERA filing record
  • the promoter's buyer-complaint & regulatory history
  • the builder's delivery track record
  • buyer-paperwork readiness
  • location & connectivity
  • plan-extracted unit layouts
  • filtered sanctioned-plan callouts

To confirm with the builder:

  • 1 buyer-paperwork item still needs builder/lawyer follow-up.

Report map

Declared completion
29 Dec 2021
Date in the public UP-RERA project row.
Registry completion signal
Needs OC/CC check
Verify OC/CC before treating this as ready-to-move.
Public docs
73
Plan PDFs read
4
Unit layouts
5
Site callouts
5
Buyer docs
6/7

Decision Summary

Due-diligence level
High
Regulatory & disputesHigh
Completion paperworkMedium
Buyer paperworkMedium
Site-layout checkMedium

This is a verification level, not a delivery verdict. Regulatory & disputes reflects the UP-RERA buyer-complaint count and any NCLT insolvency flag. Completion paperwork asks whether the checked records show a clean OC/CC signal. Buyer paperwork summarizes document readiness. Site-layout check summarizes whether the filed plans raise tower-level follow-up questions.

Registry completion signal needs verification. The registry row shows declared completion as 2021-12-29, but the records checked for this report do not show a clean OC/CC signal. Treat this as a paperwork verification item before treating the project as ready-to-move.UP-RERA record
5 unit layouts had readable room labels or dimensions. Use the room-dimension table to compare the unit the sales team shows you against similar layouts.Filed plan
Utility / service callouts were read from the layout: TRANSFORMER, DG YARD. Ask the builder to mark your tower and flat against these before treating the location as comfortable.Filed plan
1 buyer-paperwork item needs follow-up (Agreement for sale).UP-RERA record
76 buyer complaints are on file against this project at UP-RERA — a high count. Ask the builder what they concern (possession delays, quality, refunds) and whether any are still unresolved before committing money.UP-RERA record

What I'd Do As A Buyer

The shortest version of this report: specific moves for your situation, each tied to a filing or plan fact below.

If you are shortlisting a specific flat: ask the builder to mark that flat and tower on the sanctioned layout, then compare it with the utility/service callouts shown here.
If a broker quotes a unit size: compare the quoted dimensions against the filed floor-plan rows below, especially bedrooms, kitchen, toilets, and balcony/terrace areas.
If you need a ready-to-move home: verify completion-certificate status separately; the records checked here do not show a clean OC/CC signal.
If you are about to pay a booking amount: collect the missing or unclear buyer documents listed in the checklist and have your lawyer review them.
If the builder says all regulatory filings are clean: ask them to explain the UP-RERA QPR-default or abeyance listing and show the latest quarterly-filing acknowledgement.
If the builder cannot map your flat to the sanctioned plan: do not treat facing, utility proximity, or area claims as verified.

Who This Suits & What To Verify

Buyers comparing specific layouts: the report has filed-plan room dimensions you can match against a quoted unit.
Best for buyers willing to verify exact tower/flat position: the layout shows utility/service callouts, and the impact depends on where your unit sits.
!If you need completion-certificate certainty, verify OC/possession status before treating this as ready-to-move.
Use this as a due-diligence map: it points to what to ask next, not a substitute for legal review or a site visit.

Questions To Ask The Builder

  1. Please mark my exact flat, tower, and floor on the sanctioned layout plan used for this filing.
  2. Please share the dimensioned floor plan for the exact unit being offered, not only the brochure plan.
  3. How far is this flat or tower from the service and utility callouts visible on the filed layout?
  4. What is the current completion-certificate or occupancy-certificate status?
  5. Why does the project appear with a UP-RERA QPR-default or abeyance flag, and where is the latest filing acknowledgement?
  6. Can you provide the missing or unclear buyer paperwork items listed in this report before booking?
  7. Which uploaded UP-RERA document should my lawyer use as the controlling version?

Official Filing Snapshot

Official fieldUP-RERA value
Project addressGREATER NOIDA
Project typeOngoing
Registration date27-07-2017
Proposed period63 months
Promoter projects on UP-RERA1
Promoter complaints on UP-RERA91 (Under Registration - 0 )
Project complaints on UP-RERA76

What the filing tells you

Synthesis from the UP-RERA record — complaint history, regulatory flags, the builder’s local delivery record, and paperwork readiness, read the way a sales team won’t volunteer.

Buyer complaints76 buyer complaint(s) are on file against this project at UP-RERA — a high count for the project itself. Separately, the promoter carries 91 complaint(s) across its UP-RERA portfolio — a sizeable volume worth probing regardless of this project's own count. Complaints here usually cluster around possession delays, construction quality, or refunds; ask the builder specifically what they're about and whether any are still unresolved before you commit money.

Filed Plan Evidence

Floor plans of all types (1 of 3)

Floor plans of all types (1 of 3)

Filed drawing reviewed for this report

Pages: 1 · floor-plan pages found: 1 · site-layout pages found: none

Floor plans of all types (2 of 3)

Floor plans of all types (2 of 3)

Filed drawing reviewed for this report

Pages: 1 · floor-plan pages found: 1 · site-layout pages found: none

Floor plans of all types (3 of 3)

Floor plans of all types (3 of 3)

Filed drawing reviewed for this report

Pages: 1 · floor-plan pages found: none · site-layout pages found: none

Sanctioned Layout Plan (Of Entire Project)

Sanctioned Layout Plan (Of Entire Project)

Filed drawing reviewed for this report

Pages: 1 · floor-plan pages found: none · site-layout pages found: none

Filed Unit Layouts

5 layouts in the filed floor plans had readable room labels or dimensions. Use them to check whether the unit being pitched to you has similar room sizes and whether any room, balcony, or service area is materially different from the brochure claim.

Unit / plan labelReadable dimensionsPlan page
TRA-02Toilet: 1730X1045; St. Room: 1830X2135; Kitchen: 3675 x 2325; Ent. Lobby: 1525 x 4045; Bed Room: 3485 x 39801
lower floor unit (partial)Ent. Lobby: 1525x4045; Dining: 3310x3400; Living: 3350x58601
Unit No. 44, First Floor, Tower-3-1
TRA-02 UPPER FLOORBALCONY (upper): 1500 WIDE x 5' WIDE; BED ROOM (upper): 3675x4690; TOILET (upper): 1525x3930; BED ROOM (lower): 3485x3980; TOILET (lower): 1990x27601
Lower Floor unit (partial)TOILET (top-left): 1525x3930; TOILET (right): 1965x3815; Bed Room: 3350x5860; Balcony: 1500 WIDE1

Which Unit to Buy Here

From the sanctioned site plan, we map every block against the amenities worth being near and the utilities worth avoiding, using each item's position on the plan:

✓ Swimming Pool✗ Dg Yard✗ Transformer
MixedTower 02 overlooks the swimming pool but also reads on the plan as close to the dg yard — favour higher floors and the side away from the dg yard. Confirm the exact tower against the sanctioned plan before you decide.
MixedTower 01 is set away from both the key amenities and the utilities. This is a low-confidence read of the filed drawing — treat it as a flag to check the transformer's position on the sanctioned plan, not a settled fact.
MixedTower 03 overlooks the swimming pool but also reads on the plan as close to the transformer — favour higher floors and the side away from the transformer. Confirm the exact tower against the sanctioned plan before you decide.

Positions are read from the sanctioned plan, not surveyed; distances are relative within the plan, not metres. Treat this as where to look first and what to check on a site visit — not a final verdict.

Two flats in the same project can differ 15–20% in liveability and resale for the same price. Here's how to pick the right one — tower, side, floor, facing, position and size — read off the sanctioned plan and the filed inventory. Directional, not surveyed: verify on a site visit.

2 · Which floor

Target the upper-middle floors: high enough to clear street dust, boundary-wall sightlines, mosquitoes and ground-floor privacy/security worries, but below the very top floor (terrace heat and leak risk). Avoid the ground and first floor (dust, noise, privacy, waterlogging in a bad monsoon) unless you specifically want a private-garden unit and accept the trade-offs. In any tower sitting next to the STP, DG set or transformer, buy higher — odour, generator noise and EMF concentrate at the lower floors. Ask which floors are refuge/service floors and skip the flats directly above or below them.

3 · Which facing

Target North, Northeast and East-facing homes — even, glare-free light all day and no direct heat load — the safe pick. Steer clear of South, West and Southwest-facing living rooms and bedrooms — west/south-west take the full 2–7pm summer sun (heat you pay to fight with the AC all year). A west kitchen or utility is fine; a west master isn't. Confirm the exact facing with a compass on site — brochure 'park-facing' isn't a compass reading.

4 · Which flat on the floor

Prefer a corner unit — two or three external walls mean cross-ventilation, light on more than one side, more windows and a resale premium. Avoid the flat that shares a wall with the lift shaft or staircase (vibration, footfall, less privacy) and the one beside the garbage chute or electrical/meter room. Check the units-per-floor-per-lift ratio — more than ~4 flats sharing one lift core means waits and crowding.

If it were my money

I'd target a north/east-facing corner unit on an upper-middle floor. I'd pass on west/south-west-facing living rooms and bedrooms and anything on the ground/first floor or the top floor.

Plan-derived guidance, not a survey or a vastu consultation — confirm facing, tower distances and floor specifics on site.

Buyer Paperwork Checklist

Buyer documentStatusUP-RERA row
Agreement for salenot listed-
Allotment letteron fileProforma of Allotment Letter
Conveyance deedon fileProforma of Conveyance Deed
Encumbrance declarationon fileDetails of Encumbrances
Form-B affidaviton fileAffidavit (Form-B)
Commencement certificateon fileCommencement Certificate
Occupancy/completion proformaon fileProforma of Completion Certificate(Occupancy)

Location & Connectivity

The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Sector 18 commercial3 km
Sector 62 IT hub5 km
Noida Expressway (Sec 125–142)8 km
Connaught Place, Delhi13 km
IGI Airport, Delhi24 km
Noida Int'l Airport, Jewar58 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Document Catalog

Full uploaded-document list from the UP-RERA project page. Most rows are here for legal traceability; the earlier sections call out the buyer-relevant items.

Show full document list (73 rows)
DocumentUpload typeCategoryUse in this report
Other Plan(If Any)NewplanListed in UP-RERA catalog
Proforma of Conveyance DeedNewcomplianceListed in UP-RERA catalog
Proforma of Application FormNewcomplianceListed in UP-RERA catalog
Waste Disposal PlanNewplanListed in UP-RERA catalog
Development Work PlanNewplanListed in UP-RERA catalog
Water Supply PlanNewplanListed in UP-RERA catalog
Electricity Supply PlanNewplanListed in UP-RERA catalog
Commencement CertificateNewcomplianceListed in UP-RERA catalog
Details of EncumbrancesNewcomplianceListed in UP-RERA catalog
Proforma of Allotment LetterNewcomplianceListed in UP-RERA catalog
Proforma of Completion Certificate(Occupancy)NewcomplianceListed in UP-RERA catalog
Affidavit (Form-B)NewcomplianceListed in UP-RERA catalog
Affidavit (Form-B)NewcomplianceListed in UP-RERA catalog
ENGINEERS CERTIFICATENewcomplianceListed in UP-RERA catalog
ARCHITECT CERTIFICATENewcomplianceListed in UP-RERA catalog
CA CERTIFICATENewcomplianceListed in UP-RERA catalog
Development Work PlanOldplanListed in UP-RERA catalog
Development Work PlanOldplanListed in UP-RERA catalog
Development Work PlanOldplanListed in UP-RERA catalog
Details of EncumbrancesOldcomplianceListed in UP-RERA catalog
Registry Document In Case of Own LandOldcomplianceListed in UP-RERA catalog
Registry Document In Case of Own LandOldcomplianceListed in UP-RERA catalog
Electricity Supply PlanOldplanListed in UP-RERA catalog
Water Supply PlanOldplanListed in UP-RERA catalog
Waste Disposal PlanOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanUsed in this report
Floor plans of all typesOldplanUsed in this report
Floor plans of all typesOldplanUsed in this report
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Floor plans of all typesOldplanListed in UP-RERA catalog
Commencement CertificateOldcomplianceListed in UP-RERA catalog
Commencement CertificateOldcomplianceListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)OldplanListed in UP-RERA catalog
Sanctioned Layout Plan (Of Entire Project)OldplanUsed in this report
Authentic copy of Approval of ProjectOldcomplianceListed in UP-RERA catalog

Want the full picture on Mahagun Mantra II?

This page is the free UP-RERA filing summary. The RERA Property Intelligence Report goes deeper — buyer-complaint history, regulatory flags, the builder's track record, the official filing snapshot, and (where the sanctioned plans support it) room-by-room unit data and an annotated site plan. See a real one first:

Sample: Mahagun Mantra II →  ·  Sample: ATS Knightsbridge →  ·  Sample: Cleo County →

₹4,999 · delivered within 1 working day

Not useful to your decision? Full refund — no questions asked.

Pay ₹4,999 via UPI →
Scan to pay 4999 by UPI

or scan · 9028056255@idfcfirst

Paid? Tell us where to deliver it:

Prefer to talk first, or have a portfolio to check? Email hello@quietlist.in. An information aid for your own due diligence, not legal or investment advice.