MahaRERA Property Intelligence · Mumbai Suburban

Elysian Tower A

P51800027667 · Goregaon East · promoter Oberoi Realty Limited

Certificate SignedDue 30 Jun 2027

Decision Scorecard

The read: Nothing adverse on the MahaRERA record — the clean baseline. Registration is not completion, so still confirm the occupancy certificate and your exact carpet area before you book.
Regulatory standingGOODRegistration signed and active, no adverse list entry.
Construction progressNOTE~102.0% of the estimated cost incurred (last filing).
Delivery timelineGOODDeclared completion ~11 months out.
Legal & litigationGOODNo litigation on the MahaRERA record.
Buyer complaintsGOODNo buyer complaints on record.
Builder track recordGOOD12 projects, none currently flagged.
Sales / inventoryNOTE~95% of 336 homes sold; 18 available. ₹1370.81 Cr of ₹2248.43 Cr collected.

What the filing tells you

Synthesis from the MahaRERA record — registration status, the promoter's declared deadline, complaint and litigation history, compliance-filing discipline and the builder of record, read the way a sales team won't volunteer.

Filing its progress reportsThe project has filed quarterly progress reports across 8 year(s) with no current default and no period was ever flagged for default — a promoter still reporting to MahaRERA is one you can hold to the record.
How much is soldOf 336 homes, ~95% are sold/booked with 18 still available per the promoter's inventory filing.
Builder's wider record is cleanAcross MahaRERA, Oberoi Realty Limited runs 12 projects with none currently carrying a regulator flag — a reassuring portfolio signal, though it doesn't erase any issue flagged on this specific project above.
Declared completion still aheadPromoter-declared completion is 30 Jun 2027 (~11 months out) — a commitment on the RERA record you can hold them to.
Validly registered, nothing adverse on fileThe MahaRERA registration is signed and active with no regulator flag, QPR default, overdue building or buyer complaint on record — the clean baseline (registration is not completion; confirm the OC separately).

What I'd Do As A Buyer

  1. Confirm the occupancy/completion certificate, the sanctioned plan and its FSI, the 7/12 land extract and title, and your exact carpet area on the agreement — the record shows where to look, not a substitute for your own checks.

Questions To Ask The Builder

The Sanctioned Layout Plan

The layout the promoter actually filed with MahaRERA — rarely shown to buyers. Read where each tower sits relative to the internal roads, the open spaces and the plot boundaries before you pick a flat.

The sanctioned layout plan filed with MahaRERA
The full sanctioned layout plan as filed with MahaRERA — click to enlarge. A scanned document; read positions as approximate and confirm your exact flat against the dimensioned plan.

From the sanctioned site plan, we map every block against the amenities worth being near and the utilities worth avoiding, using each item's position on the plan:

✓ Garden Reservation✓ Lbp Pool Tank✓ Swimming Pool✓ Tennis✗ Pump Room✗ Stp

Of the 10 blocks on the sanctioned plan, 7 sit next to the key amenities and 2 back onto utilities. Where you buy within the project matters:

FavourBldg. No. 5, Bldg. No. 3, Bldg. No. 2, Bldg. No. 6, Bldg. No. 4, Bldg. No. 1 and Bldg. No. 7
the pick of the layout — closest to the garden reservation. Target higher floors here.
MixedBldg. No. 8
a mix — near an amenity but also within range of a utility; favour higher floors on the amenity side.
Be cautiousResidential Bldg. No. 1 and Residential Bldg. No. 2
nearest the pump room and stp — expect odour, pump/generator noise and EMF at the lower floors; prefer higher floors and the elevation facing away, or another block.

A closer read on a few:

Bldg. No. 5 is the pick of this layout — it overlooks the garden reservation and is clear of the project's utilities. A unit here, on a higher floor, is where the premium sits.
Bldg. No. 3 is the pick of this layout — it overlooks the garden reservation and is clear of the project's utilities. A unit here, on a higher floor, is where the premium sits.
Residential Bldg. No. 1 sits adjoining the pump room — expect vehicle movement and service noise. On the plus side it overlooks the swimming pool, so mid-to-high floors on the far side soften the trade-off.
Residential Bldg. No. 2 sits adjoining the stp — expect odour and pump/processing noise at the lower floors. On the plus side it overlooks the swimming pool, so mid-to-high floors on the far side soften the trade-off.

Positions are read from the sanctioned plan, not surveyed; distances are relative within the plan, not metres. Treat this as where to look first and what to check on a site visit — not a final verdict.

Sales & Inventory

Of 336 homes filed with MahaRERA, 318 are sold/booked (317 with registered agreements + 1 booked) and 18 remain available (~95% sold) — nearly sold out — little inventory left, so you're buying into an established buyer base. Buyers have committed ₹2248.43 Cr in agreement value so far. Of that, ₹1370.81 Cr (~61%) is already collected, ₹877.62 Cr receivable — a read on how far along these sales really are. This is the promoter's own reported inventory as at the last compliance filing; confirm current availability directly.

What buyers actually paid: across 318 registered agreements, the effective carpet rate is ₹33,714/sqft (typical range ₹27,476–₹45,697) — computed from the agreement values and carpet areas the promoter filed, not broker quotes. Compare your quote against this before negotiating.

The unsold units on the filing — if you're quoted a unit NOT on this list, ask why it shows as sold/booked on the RERA record:

FloorUnitCarpetReckoner value
Floor 5858041,737 sqft (161.33 sqm)₹5.75 Cr
Floor 6161041,737 sqft (161.33 sqm)₹5.75 Cr
Floor 6262012,400 sqft (222.99 sqm)₹7.96 Cr
Floor 6262021,847 sqft (171.55 sqm)₹6.10 Cr
Floor 6262031,746 sqft (162.23 sqm)₹5.78 Cr
Floor 6262041,737 sqft (161.33 sqm)₹5.75 Cr
Floor 6262051,847 sqft (171.55 sqm)₹6.10 Cr
Floor 6262062,400 sqft (222.99 sqm)₹7.96 Cr
Floor 6363012,400 sqft (222.99 sqm)₹7.96 Cr
Floor 6363021,847 sqft (171.55 sqm)₹6.10 Cr
Floor 6363031,746 sqft (162.23 sqm)₹5.78 Cr
Floor 6363042,705 sqft (251.3 sqm)₹9.50 Cr
Floor 6363051,847 sqft (171.55 sqm)₹6.10 Cr
Floor 6363062,400 sqft (222.99 sqm)₹7.96 Cr
Floor 6464012,400 sqft (222.99 sqm)₹7.96 Cr
Floor 6464021,847 sqft (171.55 sqm)₹6.10 Cr
Floor 6464051,847 sqft (171.55 sqm)₹6.10 Cr
Floor 6464062,400 sqft (222.99 sqm)₹7.96 Cr

No units are declared mortgaged, reserved, investor-held or not-for-sale in this inventory filing — still confirm your specific unit's status in the agreement.

Construction Progress

MahaRERA's cost filing puts construction at ~102.0% of the estimated project cost incurred as of the last certificate (₹415.35 Cr spent against a ₹407.22 Cr estimate). This financial % is the regulator's own proxy for how much is physically built — the closest public read on real progress, and one a brochure never shows.

Cost-incurred % as last certified to MahaRERA; it can lag on-site reality between filings. Confirm the current stage and the latest Form 2 before you book.

Delivery & Registration

MahaRERA registrationP51800027667
Registered on25 Dec 2020
Promoter-declared completion30 Jun 2027
Current statusCertificate Signed
Against today11 months to the declared date

Regulatory Standing

MahaRERA's own defaulter/deregistration lists and the project's quarterly-progress-report filing — the regulator's view of whether this project is in good standing.

Builder Track Record

Across MahaRERA, Oberoi Realty Limited is the promoter of record on 12 project(s), of which none currently carry a MahaRERA regulator flag (insolvency, deregistration, completion-lapse or QPR default). Read the pattern across the portfolio, not just this project's brochure — matched on the promoter name in the MahaRERA register.

Complaints

No buyer complaints were on this project's MahaRERA record at the time of reading — a clean sheet worth re-checking near booking.

RERA Escrow Account

RERA requires 70% of buyer collections to sit in a designated account spent only on this project. As last filed, that account shows ₹959.57 Cr deposited, ₹633.50 Cr withdrawn for construction, and a closing balance of ₹326.07 Cr.

Project Funding

How the promoter says the project is funded, filed as estimated and actual. The project's own filing moved from an estimated ₹760.82 Cr to an actual ₹786.17 Cr (+3%) — a cost escalation to ask the builder to explain. On the actual filing the developer's OWN funds are ₹152.67 Cr (~19% of the total) against ₹0 borrowed and ₹633.50 Cr from buyer receipts — a read on how much of the developer's own capital is committed versus riding on your money.

FilingOwn fundsBorrowedBuyer receiptsTotal
Estimated₹76.08 Cr₹0₹684.74 Cr₹760.82 Cr
Actual₹152.67 Cr₹0₹633.50 Cr₹786.17 Cr

Buildings & Wings

The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+79 and 336 homes are registered across the project.

BuildingWingsFloorsHomesDeclared completion
Tower A1G+79336-

Unit mix on the filing: 336 habitable floor.

Filed Document Catalog

The documents the promoter has actually filed with MahaRERA for this project — the paperwork trail a buyer's lawyer should read in full. Their presence on the register is a good sign; ask for a certified copy of each before you sign.

Filed documentWhat it is
Commencement certificatethe municipal commencement certificate
Form 1 — Architect's certificatethe architect's certified % of work completed
Form 3 — CA certificatethe chartered accountant's certificate on funds withdrawn
Form 2 — Engineer's certificatethe engineer's cost-incurred certificate
Title / search reportthe legal title-search report on the land
Form B — Promoter declarationthe promoter's declaration-cum-affidavit
Sanctioned building planthe approved building plan
Sanctioned layout planthe approved site layout

Plus 79 other supporting file(s) on the MahaRERA record.

Engineering, Cost & Professionals

The professionals of record on the MahaRERA filing — the people whose licences are on the line for the certified filings:

RoleName / firmReg. no.
ArchitectSIDDHESHCA/2009/43962
ArchitectSunil Arora-
ArchitectTechcomm Urban Management Consultant Pvt. Ltd.CA/86/9688
ArchitectShashank KokilCA/85/9400
EngineerLERA CONSULTING STRUCTURAL ENGINEERS (I) PVT LTDSTR/T/49
EngineerLeslie E. Robertson Associates Consulting Engineers (India) Pvt Ltd Structural Engineer-
EngineerMehul Shah-
Chartered AccountantTMG & Associates107748
Chartered AccountantS R B C & CO LLP-
OtherA.A. Nayak Constructions Pvt. Ltd.-
OtherSEED Engineering Consultants Pvt. Ltd.-
OtherMeinhardt Façade Technology (S) Pte Ltd-
OtherWalker Parking Consultants-
OtherFortune Consultants Ltd.-
OtherLangan Engineering and Environmental Services-
OtherEN3 Susstainability Solutions Pvt Ltd-
OtherAditya Enterprises-
OtherCapacite Infraprojects Limited-

Separately, 53 MahaRERA-registered real-estate agent(s) are attached to this project as its sales channel — a measure of the selling machine behind it, not of build accountability. Whoever shows you a flat, verify their MahaRERA agent registration and deal only on the terms in the filed agreement drafts.

Location, Land & Connectivity

Located at Goregaon East, Off Western Express Highway, Borivali, Mumbai Suburban, 400063. Per the filed land record, the plot is bounded to the north by 95-4-B-4 pt of Village Dindoshi, to the south by 95-4-B-4 pt of Village Dindoshi, to the east by 95-4-B-4 pt of Village Dindoshi and to the west by 95-4-B-4 pt of Village Dindoshi. Confirm these against the 7/12 extract and the sanctioned plan before you rely on them.

Location & connectivity

The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Andheri MIDC / SEEPZ5 km
Powai / Hiranandani business park7 km
Chhatrapati Shivaji Int'l Airport9 km
Bandra Kurla Complex (BKC)12 km
Lower Parel / Worli business district19 km
Nariman Point / Fort27 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Before You Book

This report reads the MahaRERA public record — the promoter's own declarations. Independently confirm: the occupancy/completion certificate, the sanctioned plan and its FSI, the 7/12 land extract and title, the exact carpet area on your agreement, and any complaint/litigation orders in full. Treat the record as where to look first, not a substitute for your own diligence.