Noida region · project records

Noida & Ghaziabad project RERA timelines.

Declared completion date and status for 1,432 registered Noida-region projects. Search any project →

"1st - A Park View" - Gaur Yamuna City

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-10

"1st - B Park View" - Gaur Yamuna City

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-10

1120 NO. OF EWS Houses AT SEC-17 Mandola Viha

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2019-03

14th Avenue - Gaur City

Gaursons Promoters Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-03

168xaviers - Cambridge AND Crystal

Opulent Infradevelopers Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

168xaviers - Mariott Tower

Opulent Infradevelopers Private · Gautam Buddha Nagar — Past declared deadline, declared 2019-03

16th Parkview - Gaur Yamuna City

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-02

170 NOS Plots IN Sector 10, Siddharth Vihar Yojna, Ghaziabad

Awas Evam Vikas · Ghaziabad — On track, declared 2030-04

21st Milestone Residency Ghaziabad

Ifci Infrastructure Development · Ghaziabad — Completed · Completion cert on record, declared 2016-12

266 Multistorey Flats AT Gh10 IN Koyal Enclave

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2018-04

282 Multistorey Flats Under SAY

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2020-08

2nd Parkview

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-10

32nd Parkview

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-10

3rd Park View - Gaur Yamuna City

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-10

504 Multistorey Flats AT GH-11,12 IN Koyal Enclave

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2019-09

52nd Avenue

Mmr Saha Infrastructure · Gautam Buddha Nagar — Past declared deadline, declared 2023-03

58 High Street

Charms India Pvt · Ghaziabad — Due soon, declared 2026-11

6th Parkview

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-10

7th Avenue - Gaur City

Gaursons Hi-Tech Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-03

7th Park View - Gaur Yamuna City

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-10

896 EWS Houses Indraprastha Awasyia

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2017-12

A R Domain

Buildtech Pvt Ltd · Ghaziabad — On track, declared 2028-03

A R Reflections

Buildtech Pvt Ltd · Ghaziabad — Completed · Completion cert on record, declared 2017-07

Aaradhayam

Earthwaves Developers Private · Ghaziabad — Completed · Completion cert on record, declared 2025-10

Aarza Square-1

Aarza Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Aarza Square-2

Aarza Infratech Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Aashiyana Glory

Investors Inn Infrastructure · Gautam Buddha Nagar — Past declared deadline, declared 2019-06

Aastha Greens

Aastha Infracity Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-12

Aastha MIG Zone I

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Aastha MIG Zone II

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2022-12

Aastha MIG Zone III

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

ACE Acreville

Three Homes Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-03

ACE Divino

Starcity Real Estates · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-10

ACE Edit

Logix Buildestate Pvt · Gautam Buddha Nagar — On track, declared 2029-04

ACE Estate

Logix Buildestate Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-12

ACE Hanei

La Buildtech Private · Gautam Buddha Nagar — On track, declared 2028-10

ACE Hive

Three Homes Pvt · Gautam Buddha Nagar — On track, declared 2028-09

ACE Medley Avenue

Logix Builders Promoters · Gautam Buddha Nagar — Past declared deadline, declared 2024-05

ACE Parkway

Ace Infracity Developers · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

ACE Starlit

Star Landcraft Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-04

ACE Tech

Star Landcraft Private · Gautam Buddha Nagar — On track, declared 2030-10

ACE Terra

Ajay Realcon India · Gautam Buddha Nagar — On track, declared 2028-12

ACE Verde

Three Homes Pvt · Gautam Buddha Nagar — On track, declared 2029-04

ACE YXP

Starcity Builders And · Gautam Buddha Nagar — Due soon, declared 2027-03

Aditya SCO Complex

Utility Estates Private · Ghaziabad — On track, declared 2028-12

Advant Navis Business Park

Advant It Park · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-06

Aero Heights

Srm Infratech Solutions · Ghaziabad — On track, declared 2028-09

Affordable Housing Sector-22D Yeida

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Aggarwal Heights

Bankey Bihari Infrahomes · Ghaziabad — Completed · Completion cert on record, declared 2021-02

AIG IN Royal

Alpine Infraprojects Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

AIG Royal

Alpine Infraprojects Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

AIG Royal

Alpine Infraprojects Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

Aigin Royal Park

Aig Buildcon Private · Ghaziabad — On track, declared 2029-05

Aigin Royal Phase 4

Alpine Infraprojects Pvt · Gautam Buddha Nagar — On track, declared 2028-03

Aims Golf Avenue

Aims Promoters Private · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

Aims Green Aenue

Aims Golf Town · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-12

Aims Green Avenue

Aims Golf Town · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Aims Green Avenue

Aims Golf Town · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

Aishwaryam

Wall Rock Infratech · Gautam Buddha Nagar — Past declared deadline, declared 2019-11

Ajnara City Centre

Ajnara India Limited · Ghaziabad — Past declared deadline, declared 2022-03

Ajnara City Villa

Ajnara India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Ajnara Homes

Apv Realty Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Ajnara Homes

Apv Realty Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

Ajnara Homes

Apv Realty Limited · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Ajnara Panorama

Ajnara India Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-02

Ajnara Panorama

Ajnara India Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-02

Ajnara Panorama (phase-3 Studio & Convinient Shops

Ajnara India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Alpha Grand

Vdminfra Projects Llp · Gautam Buddha Nagar — On track, declared 2030-03

Alpha Plaza

Shree Vinayaka Infraspace · Gautam Buddha Nagar — Past declared deadline, declared 2019-03

Alphathum PH-III

Bhutani Group · Gautam Buddha Nagar — Past declared deadline, declared 2022-07

Alphathum Phase - IV

Bhutani Group · Gautam Buddha Nagar — Past declared deadline, declared 2022-08

Alphathum Phase 1

Bhutani Group · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-05

Alphathum Phase 2

Bhutani Group · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-05

Alstonia Apartments

Ans Apartments Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-03

Amaatra Crystal

Landcon Pvt Ltd · Ghaziabad — Completed · Completion cert on record, declared 2025-09

Amaatra Homes

Nandi Infratech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-12

Amadeus

Saha Infratech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Amara Residences

Elegant It Solutions · Gautam Buddha Nagar — On track, declared 2030-03

Ambarbyarihant

Citycon Buildwel Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-07

Ambience Tiverton

Ambience · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-09

Ambika Apartment

Ambika Engineers · Ghaziabad — Past declared deadline, declared 2016-10

Ambrosia

Ivr Prime Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-03

Ambrosia

Ivr Prime Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Ambrosia

Ivr Prime Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Ambrosia Phase 04

Ivr Prime Developers · Gautam Buddha Nagar — Past declared deadline, declared 2024-08

Anandam Square

Friends Land Developers · Ghaziabad — Completed · Completion cert on record, declared 2021-04

Anant Best Homes

Sajid Khan · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Andromida Planet ONE

Andromida Real Estate · Ghaziabad — Past declared deadline, declared 2023-05

Angel Jupiter - Phase 1

Aadinath Probuild (India) · Ghaziabad — Past declared deadline, declared 2017-12

Anika Classic

Elly Realcon Private · Ghaziabad — Past declared deadline, declared 2024-06

Antara Noida Phase 1

Contend Builders Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Anthurium

Aircon Systems India · Gautam Buddha Nagar — Past declared deadline, declared 2024-04

Antriksh Golf City

Contend Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Antriksh Golf City

Contend Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Antriksh Golf City

Contend Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-01

Antriksh Golf City

Contend Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-01

Antriksh Golf City

Contend Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Antriksh Golf City - Commercial

Contend Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-01

Antriksh Golf Link

Antriksh Engineers Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Antriksh Golf Link Phase 2

Antriksh Engineers Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-11

Antriksh Golf Links

Antriksh Engineers Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-08

Antriksh Golf View - I

Antriksh Developers Promoters · Gautam Buddha Nagar — Past declared deadline, declared 2022-03

Antriksh Golf View I

Antriksh Developers Promoters · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-09

Antriksh Golf View II

Colorful Estates Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-05

Antriksh Golf View II - Phase I

Colorful Estates Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Antriksh Golf View II- Commercial

Colorful Estates Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Antriksh Grand View

Consortium Infrastructure Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2022-09

Antriksh Grand View

Kailashpuri Bulidtech Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-09

Antriksh Kanball 3G & Forest

Perfect Propbuild Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2019-01

Antriksh Sanskriti

Antriksh Realtech Pvt · Ghaziabad — Past declared deadline, declared 2025-07

Antriksh Valley

Diligent Builders Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2027-12

Apex Athena

Apex Dream Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-05

Apex Court

Apex Infraventures Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-01

Apex Golf Avenue

Floral Realcon Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2019-06

Apex Park Square

Floral Realcon Pvt · Gautam Buddha Nagar — Due soon, declared 2026-08

Apex Quebec

Shadbolt Buildworld Private · Ghaziabad — Due soon, declared 2027-03

Apex SKY Height

Value Infratech India · Ghaziabad — On track, declared 2031-02

Apex THE Flours

Greatway Buildcon India · Ghaziabad — Past declared deadline, declared 2018-03

Apex THE Kremlin

Apex Heights Private · Ghaziabad — Past declared deadline, declared 2021-11

Apex THE RIO

Rio Heights Private · Ghaziabad — Past declared deadline, declared 2024-08

Apple7, Tower S2a, S2B

Asgi Properties Pvt · Ghaziabad — Past declared deadline, declared 2024-04

Aprameya Residency

Krishna Estate Developers · Ghaziabad — Past declared deadline, declared 2018-05

Aradhyam Boutique Residences

Aradhyam Builders Sudhan · Ghaziabad — Due soon, declared 2026-08

Aradhyam Plot C

Aradhyam Builders Vijay · Ghaziabad — Past declared deadline, declared 2026-03

Aradhyam Shopping Mall

Aradhyam Builders Sudhan · Ghaziabad — On track, declared 2029-08

Aradhyam SPA City Phase 1

Aradhyam Builders Sudhan · Ghaziabad — Due soon, declared 2027-03

ARC Angels

Divay Angels Realtor · Ghaziabad — Completed · Completion cert on record, declared 2018-02

Arihant Abode

Prosper Buildtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-05

Arihant Arden Phase 3

Arihant Infrra Realtors · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Arihant Enclave

Au Real Estate · Ghaziabad — Completed · Completion cert on record, declared 2028-03

Arihant ONE

Arham Escon Pvt · Gautam Buddha Nagar — On track, declared 2027-09

Arihant Seasons

Arihant Urban Space · Gautam Buddha Nagar — On track, declared 2031-01

Arocon Rainbow

Arocon Real Estate · Ghaziabad — Completed · Completion cert on record, declared 2023-09

Artha Block-A

Artha Infratech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2028-12

Artham

Wiztown Planners Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-03

ARV Arcade

Kingson Infracon Llp · Ghaziabad — Due soon, declared 2027-03

Ashtech Presidential Towers

Ashtech Industries Private · Gautam Buddha Nagar — On track, declared 2030-09

Aspire Plaza

Nirala Housing Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-03

Assotech Canopy

Assotechlimited Crossings Infrastructure · Ghaziabad — Past declared deadline, declared 2026-06

Assotech Celeste Towers

Assotechlimited · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Assotech Realty Private Limited

Assotech Realty Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-06

Assotech THE Nest

Assotechlimited · Ghaziabad — On track, declared 2027-11

Assotech Windsor Court Phase-I & II

Assotechlimited · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Astrathum

Parmesh Construction Company · Gautam Buddha Nagar — On track, declared 2029-03

Astrus Capella

Astruscorp Superstructure Privatelimited · Ghaziabad — On track, declared 2030-06

Astrus Square

Advent Associates · Ghaziabad — Due soon, declared 2026-09

Atlas

Infraegis Constructions Private · Ghaziabad — On track, declared 2032-08

ATS Allure

Ats Realty Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-03

ATS Bouquet

Ats Dreamzone Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-02

ATS Destinaire

Ats Grand Realtors · Gautam Buddha Nagar — Due soon, declared 2026-11

ATS Dolce

Domus Greens Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-11

ATS Kabana High

Ats Grand Realtors · Gautam Buddha Nagar — Due soon, declared 2026-11

ATS Khyber Range

Ats Grand Realtors · Ghaziabad — Completed · Completion cert on record, declared 2025-09

ATS Kinghood Drive

Ats Homes Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-04

ATS Kingston Heath

Celerity Infrastructure Private · Gautam Buddha Nagar — Due soon, declared 2026-08

ATS Knightsbridge

Ats Heights Private · Gautam Buddha Nagar — On track, declared 2030-03

ATS LE Grandiose -Phase-I

Nobility Estates Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

ATS LE Grandiose Phase-2

Nobility Estates Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

ATS Picturesque Reprieves Phase 1

Ats Homes Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-04

ATS Picturesque Reprieves Phase 2

Ats Homes Private · Gautam Buddha Nagar — Due soon, declared 2027-03

ATS Pristine Golf Villas

Celerity Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

ATS Pristine-Phase-II

Ats Housing Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

ATS Rhapsody

Ats Township Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-03

Attalika

Ramprastha · Ghaziabad — On track, declared 2027-12

Atulya Heights

Deepsons India Private · Ghaziabad — Past declared deadline, declared 2018-12

Aurum Alumni Accord

Futureworld Constructions Private · Gautam Buddha Nagar — On track, declared 2028-07

Aurum Alumni Bliss

Starcity Infradevelopers Private · Gautam Buddha Nagar — On track, declared 2029-09

Avenue 133

Franklin Infratech Pvt · Gautam Buddha Nagar — On track, declared 2028-09

Avenue IV

Aura Buildcom Llp · Ghaziabad — On track, declared 2029-07

AVS City Centre

Avs India Infraprop · Ghaziabad — Due soon, declared 2027-03

AVS City Palace

Avs India Infra · Ghaziabad — Completed · Completion cert on record, declared 2020-02

AVS City Square

Avs India Infra · Ghaziabad — Completed · Completion cert on record, declared 2023-07

AVS Orchard

Avp Buildtech (P) · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

AVS Orchid

Perfect Propbuild Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Awho Gurjinder Vihar Phase-IV

Army Welfare Housing · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Aypee Greens Pavilion Courts & Heights,

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-03

Bandhan

Imperia · Gautam Buddha Nagar — Past declared deadline, declared 1900-01

Bankey Bihari Sharnam

Shyam Buildwell Private · Ghaziabad — Past declared deadline, declared 2019-08

Beetle LAP

Royal Hometown Planners · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Beetle LAP

Royal Hometown Planners · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-06

Beetle Orchid

Yuvraj Infra Venture · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-12

Belvedere

Sequel Buildcon Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2022-12

Belvedere

Sequel Buildcon Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2022-12

Beta Plaza

Vinayaka Square Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-03

Bharat City EWS LIG 1

Bcc Infrastructures Private · Ghaziabad — Past declared deadline, declared 2024-01

Bharat City-2A

Bcc Infrastructures Private · Ghaziabad — Past declared deadline, declared 2022-03

BHS-12/13 ETA-II GH-1a/1

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

BHS-14 EWS XU-3

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-09

BHS-16 MU-II

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-06

BHS-16 Sector-10

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

BHS-17 Lohiya Enclave Omicron-1A

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-02

BHS-17 Lohiya Enclave Sector-12

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-06

BHS-17, Lohiya Enclave, Plot NO-GH-03a, Omicron-1

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-09

Bhutani 18

Goodliving Infrastructure Private · Gautam Buddha Nagar — Due soon, declared 2026-12

Biigtech

Prasandi Infotech Park · Gautam Buddha Nagar — On track, declared 2030-06

Bliss Homes AND Bliss Square

Infracon Private Limited · Ghaziabad — Completed · Completion cert on record, declared 2023-01

Blossom County

Logix Infrastructure Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2019-08

Blossom County

Logix Infrastructure Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2018-10

Blossom Greens

Logix Infratech Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-03

Blossom Greens

Logix Infratech Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-05

Blossom Greens

Logix Infratech Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-02

Blossom Greens

Logix Infratech Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-02

Blossom Greens

Logix Infratech Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Blossom Zest

Logix City Developers · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-11

Blossom Zest

Logix City Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Blossom Zest

Logix City Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Blossom Zest

Logix City Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Blue Moon Homes

Lr Infrahomes (India) · Ghaziabad — Completed · Completion cert on record, declared 2025-09

Bluemoon Central

Progressive Construction United · Ghaziabad — On track, declared 2029-03

Boulevard Walk

Regal Emporia Infratech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-10

Boulevard Walk

Regal Emporia Infratech · Gautam Buddha Nagar — Past declared deadline, declared 2023-09

Boulevard Walk

Regal Emporia Infratech · Gautam Buddha Nagar — Past declared deadline, declared 2025-10

Boulevard Walk

Regal Emporia Infratech · Gautam Buddha Nagar — Past declared deadline, declared 2023-03

Brahmputra Enclave

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2017-12

Brookside Valley

Sharda Garments Private · Ghaziabad — Completed · Completion cert on record, declared 2028-08

Builtups Zone I

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2019-04

Bulland Calisto

Bulland Realtors Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Bulland Calisto Phase-II

Bulland Realtors Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-12

Bulland Calisto Phase-III

Bulland Realtors Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-06

Bulland Elevates

Bulland Buildtech Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

C/O OF 480 EWS Houses AND Development OF 1200 Buildings Under Pmay Scheme AT Pratap Vihar, Ghaziabad

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2025-10

Capable THE Emporia

Capable Buildwell Private · Ghaziabad — Past declared deadline, declared 2024-09

Capital Athena

Capital Infratechomes Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-09

Capital Athena

Capital Infratechomes Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-09

Capital Athena Phase-3 Commercial

Capital Infratechomes Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

Capital City

BPTP · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-12

Capitol Avenue

Anand Habitat Infrastructure · Gautam Buddha Nagar — Past declared deadline, declared 2026-07

Casa Grande

Earthcon Constructions Private · Gautam Buddha Nagar — Past declared deadline, declared 2017-11

Casa Grande-2

Earthcon Constructions Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-10

Casa Grande2-Towera1

Earthcon Constructions Private · Gautam Buddha Nagar — On track, declared 2029-12

Casa Greens1

Radhey Krishna Techno · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Casa Royale & Sanskriti

Earthcon Universal Infratech · Gautam Buddha Nagar — Past declared deadline, declared 2019-03

Casa Woodstock

Angels Infraheight Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Centrade Business Park Phase I

Krasa International Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-02

Central 50

West Way City · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2028-08

Central Avenue

Asr Realtech Ltd · Ghaziabad — Past declared deadline, declared 2026-05

Central Ikon

Business Bay Fin · Gautam Buddha Nagar — On track, declared 2029-05

Central Market

West Way Realty · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2028-01

Central Plaza

Aims Angel Infratech · Gautam Buddha Nagar — Past declared deadline, declared 2022-12

Central Walk

Bcc Infrastructures Private · Ghaziabad — Past declared deadline, declared 2020-09

Charms Castle

Mr Sanjay Singhal · Ghaziabad — Due soon, declared 2026-12

Churning Monk

Gaura Builders Private · Ghaziabad — On track, declared 2029-06

Circuit Heights

Developers Pvt Ltd · Gautam Buddha Nagar — On track, declared 2027-07

City Apartments Phase-2

Agarwal Associates (Promoters) · Ghaziabad — Completed · Completion cert on record, declared 2018-09

City Apartments Phase-3

Agarwal Associates (Promoters) · Ghaziabad — Completed · Completion cert on record, declared 2022-02

City Center 150

Logix Infradevelopers Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-12

City Grace

Agarwal Associates (Promoters) · Ghaziabad — Completed · Completion cert on record, declared 2029-03

Civil Lines

Prithveelink Developers Pvt · Ghaziabad — Completed · Completion cert on record, declared 2027-08

Civitech Santoni

Civitech Buildcon Private · Gautam Buddha Nagar — On track, declared 2028-04

Civitech Stadia

Golfgreen Superstructures Private · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Civitech Strings

Sa Realtech Private · Gautam Buddha Nagar — On track, declared 2027-07

Classic Residency

Shree Energy Developers · Ghaziabad — Completed · Completion cert on record, declared 2017-12

Cleo County ,phase -2,(comprising Towers A-3,a-4,a

Iv County Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-02

Cleo County ,phase -3,(comprising Towers E1,e2,e3,

Iv County Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-02

Cleo County, PH 1 ( Comprising OF Tower D1 D2 C1 C

Iv County Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-08

Cloud 9 Towers, Vaishali

Aadi Best Consortium · Ghaziabad — Past declared deadline, declared 2019-03

Clove County

Shirja Real Estate · Gautam Buddha Nagar — On track, declared 2030-10

Coco County

Shirja Real Estate · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-09

Color Homes

Colorcity Homes Private · Ghaziabad — Past declared deadline, declared 2022-01

Commercial Complex BY KK Projects AT Delhi ONE

Kk Projects · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-04

Const. OF 480 EWS Houses Under Pmay Scheme AT Noornagar, Khasra NO. 315, 343, 351, 352 IN RAJ Nagar Extension

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2024-12

Construction 720 EWS Houses Under Pmay Scheme AT Pratap Vihar Scheme, SEC-11 Ghaziabad

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2024-12

Construction OF 1152 EWS Houses Under Pmay Scheme IN Masoori Gzb.

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2024-02

Construction OF 120 Multi Storey Houses Chandrashi

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2019-06

Construction OF 1680 Nos. Flats Under Pmay IN Sector-19, Mandola Vihar Yojna, Ghaziabad

Awas Evam Vikas · Ghaziabad — Past declared deadline, declared 2022-06

Construction OF 192 Houses AT Pocket-D Indraprasth Yojana Loni Ghaziabad

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2021-08

Construction OF 226 NOS Different Types OF Semifinished Houses IN Sector-5A Mandola Vihar Yojna Ghaziabad

Awas Evam Vikas · Ghaziabad — On track, declared 2029-09

Construction OF 252 NOS Different Type OF Semi Finished Houses IN SEC-6 Mandola Vihar Yojna Ghaziabad

Awas Evam Vikas · Ghaziabad — Due soon, declared 2026-09

Construction OF 259 Multi Storied Flat AT GH-9

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2018-04

Construction OF 288 EWS Houses Under Pmay AT Masuri, Ghaziabad

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2021-12

Construction OF 348 Multi Storey E.w.s Flats IN BL

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Construction OF 432 EWS Units Under Pmay Scheme AT Dasna Ghaziabad

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2022-03

Construction OF 463 Multistoried Apartments ON GH

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2017-09

Construction OF 528 EWS AT Rajaswa Gram Niwari, Modinagar Under Pmay Scheme.

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2024-01

Construction OF 560 EWS Multistoried Houses AT RAJ

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2016-08

Construction OF 660 Multistoried Apartments ON GH

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2018-03

Construction OF 80 Mmigflats IN Nyaya Khand-3, IND

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2017-09

Construction OF 856 Multistorey Apartments (samajw

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2019-04

Construction OF EWS Houses Under Pradhan Mantri Awas Yojana AT Madhuban Bapudham Scheme Pocket B.

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2019-01

Construction OF Four Storied 64 NOS EWS Houses AT Sector-9, Siddharth Vihar Yojna, Ghaziabad

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Construction OF Four Storied 320 EWS Houses AT BEG

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2017-10

Construction OF TWO Hundred Fifty SIX Flats AT Madhuban Bapudham Scheme

Ghaziabad Development Authority · Ghaziabad — Completed · Completion cert on record, declared 2019-05

Convenient Shopping Complex, Sector 22D

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2018-06

Cosmos Corner

Cosmos Reit Private · Ghaziabad — On track, declared 2031-04

County ONE O Seven

Countyconcept Developers Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-06

CRC Joyous

Crc Homes Private · Gautam Buddha Nagar — On track, declared 2027-09

CRC Maesta

Crc Homes Private · Gautam Buddha Nagar — On track, declared 2029-05

CRC Sublimis

Enticement Infrastructure Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-09

Crest

Ar Landcraft Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-04

Crossings Chitravan

Crossings Infrastructure Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Crossings Nidhivan

Crossings Infrastructure Pvt · Ghaziabad — Past declared deadline, declared 2018-12

Crown Residences AT Godrej Golf Links

Ar Landcraft Llp · Gautam Buddha Nagar — On track, declared 2030-05

Curio City

Orris · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Cyber

Imperia · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Cyber City

Elegant It Solutions · Gautam Buddha Nagar — On track, declared 2030-03

Cyber HUB 2

Galactic City Private · Gautam Buddha Nagar — On track, declared 2027-12

Cyber Park

Elegant It Solutions · Gautam Buddha Nagar — On track, declared 2030-03

Cyberthum Phase A

Max-Digi Infotech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-02

Cyberthum Phase B

Max-Digi Infotech Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-02

Cyberthum Phase E

Max-Digi Infotech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-02

Cyberthum Phase H

Max-Digi Infotech Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-02

Cyberthum Phase II

Max-Digi Infotech Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-09

Daffodil Tower L

Mpg Realty Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-07

Dasnac ARC

Montevista Private Limited · Gautam Buddha Nagar — On track, declared 2028-06

Dasnac Place

Westriver Private Limited · Gautam Buddha Nagar — On track, declared 2029-04

Dasnac Westminster

Homes Infrastructure Pvt · Gautam Buddha Nagar — On track, declared 2029-04

Dasnac Yuva

Clearlake Private Limited · Gautam Buddha Nagar — On track, declared 2029-10

Delhi 99 EWS AND LIG

Mr Proview Realtech · Ghaziabad — Past declared deadline, declared 2023-06

Delhi Heights

Jai Krishan Svp · Ghaziabad — Past declared deadline, declared 2022-03

Delhi ONE Tower B, FS Hotel, Resi 1,2,3 AND Retail

Boulevard Projects Private · Gautam Buddha Nagar — On track, declared 2029-08

Delhi-99

Mr Proview Realtech · Ghaziabad — Completed · Completion cert on record, declared 2022-03

Delta City Centre

Startle Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

Delta Square

Baba Projects Private · Gautam Buddha Nagar — On track, declared 2030-10

Delta Square 1

Babagreen Infrabuild Private · Gautam Buddha Nagar — On track, declared 2031-01

DEV Heights NH-24

Dbf Infrastructure Pvt · Ghaziabad — Completed · Completion cert on record, declared 2017-12

Devika Gold Homz

Devika Gold Homz · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-12

Devika Skypers

Shomit Finance Limited · Ghaziabad — Completed · Completion cert on record, declared 2019-12

Devika Skypers

Shomit Finance Limited · Ghaziabad — Completed · Completion cert on record, declared 2019-12

Digitown Phase-1

Adarsh · Ghaziabad — Due soon, declared 2026-08

Digitown-II

Adarsh · Ghaziabad — On track, declared 2027-08

Dinesh Nagar

Platina Real States · Ghaziabad — Completed · Completion cert on record, declared 2019-05

Divyansh Flora

Divyansh Infraheight Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-07

Divyansh Flora

Divyansh Infraheight Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2018-06

Divyansh Green Heights

Prasu Divyansh Infraheight · Gautam Buddha Nagar — On track, declared 2030-06

Divyansh Onyx

Divyansh Homes Pvt · Ghaziabad — Completed · Completion cert on record, declared 2024-02

Divyansh Onyx Phase-II

Divyansh Homes Pvt · Ghaziabad — Completed · Completion cert on record, declared 2024-06

Divyarv Grande

Sukadiv Projects Llp · Gautam Buddha Nagar — On track, declared 2030-09

Diya Greencity, RAJ Nagar Extn., Ghaziabad

Eureka Builders Private · Ghaziabad — Past declared deadline, declared 2021-04

DLF Techpark Noida

Urvasi Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-04

DLF Techpark Noida Phase 2

Urvasi Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-09

Dronagiri

Ajpa Parishad Sehkari · Ghaziabad — Past declared deadline, declared 2019-03

Durva Greens

Kamrup Housing Project · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

E-Square

Hotshot Developers Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-09

Earth Gracia

Earth Gracia Buildcon · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Earth Titanium

Earth Iconic Infrastructures · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Ebony Green -III

Sare Saamag Realty · Ghaziabad — Past declared deadline, declared 2021-04

ECO Village-II

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2018-09

Ekanam

Greatvalue Projects India · Gautam Buddha Nagar — On track, declared 2030-06

Eldeco 7 Peaks Residences

Eldeco · Gautam Buddha Nagar — On track, declared 2030-11

Eldeco Aamantran(inspire & Edge

Eldeco · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-12

Eldeco Ballads OF Bliss

Eldeco · Gautam Buddha Nagar — On track, declared 2030-04

Eldeco Echoes OF Eden

Eldeco · Gautam Buddha Nagar — On track, declared 2031-01

Eldeco LA Vida Bella

Eldeco · Gautam Buddha Nagar — On track, declared 2029-01

Eldeco Live BY THE Greens

Wondrous Buildmart Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Eldeco Live BY THE Greens Phase -III

Wondrous Buildmart Private · Gautam Buddha Nagar — Due soon, declared 2027-02

Eldeco Live BY THE Greens Phase-II

Wondrous Buildmart Private · Gautam Buddha Nagar — Due soon, declared 2026-12

Eldeco Whispers OF Wonder

Eldeco · Gautam Buddha Nagar — On track, declared 2030-07

Elegant Splendour Phase-1

Elegant Infracon Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

Elegant Splendour Phase-3

Elegant Infracon Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-12

Elegant Ville Phase-1

Elegant Infracon Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-09

Elegant Ville Phase-3

Elegant Infracon Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-09

Elegant Ville Phase-4

Elegant Infracon Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-09

Elite Golf Greens

Golfgreen Mansions Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2022-04

Elite X

Golfgreen Mansions Pvt · Gautam Buddha Nagar — On track, declared 2028-12

Elixir Mall

Sds Infrastructure Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-08

Embark Plaza

K2N Infra India · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-06

Emerald Court Phase II - Demolished As Per The Order Of Hon'ble Superme Court

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-11

Eminence - Phase 1

Abet Buildcon Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-09

Eminence Phase-2

Elicit Realtech Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-11

Eros Sampoornam 2

Ajay Enterprises Private · Gautam Buddha Nagar — Past declared deadline, declared 2026-06

Eros Sampoornam 3

Ajay Enterprises Private · Gautam Buddha Nagar — On track, declared 2028-12

Eros Sampoornam I

Ajay Enterprises Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-06

Estate 105

Max Estates · Gautam Buddha Nagar — On track, declared 2031-01

Estate 128

Max Estates · Gautam Buddha Nagar — On track, declared 2028-05

Estate 128 - II

Max Estates · Gautam Buddha Nagar — On track, declared 2029-09

Eureka Park - Phase 2

Land Kart Builders · Gautam Buddha Nagar — Due soon, declared 2026-09

Eureka Park-Phase 1

Land Kart Builders · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-06

Eutopia Phase-1

Tandt Realtech Private · Ghaziabad — Due soon, declared 2026-08

Evoke

Ar Landcraft Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-04

EWS Aasra Zone I

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

EWS Aasra Zone II

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

EWS Aasra Zone III

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

EWS AND LIG

Sare Saamag Realty · Ghaziabad — Past declared deadline, declared 2020-01

EWS City 1

Prestige · Ghaziabad — Due soon, declared 2026-07

EWS City 2

Prestige · Ghaziabad — Due soon, declared 2026-08

EWS Pmay

Ats Grand Realtors · Ghaziabad — Completed · Completion cert on record, declared 2026-03

Exotica 132

Exotica Infratech Llp · Gautam Buddha Nagar — On track, declared 2030-01

Exotica Dreamville Phase-III

Exotica Housing Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Exotica Dreamville Phase-IV

Exotica Housing Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-09

Experion Elements Phase-1

Experion · Gautam Buddha Nagar — On track, declared 2029-01

Experion Elements Phase-2

Experion · Gautam Buddha Nagar — On track, declared 2029-01

Experion Saatori

Experion · Gautam Buddha Nagar — On track, declared 2030-12

Express Astra

Express Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2026-03

Express Astra

Express Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2026-03

Express Greens

Express Properties Private · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Express ONE

Solid Properties Private · Ghaziabad — Past declared deadline, declared 2025-12

Express One34

Expressway Hospitality Private · Gautam Buddha Nagar — On track, declared 2030-07

Express Zenith

Express Builders Promoters · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Express Zenith

Express Builders Promoters · Gautam Buddha Nagar — Past declared deadline, declared 2026-03

EYE OF Noida - Block-A

Fairfox Itinfra Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-12

EYE OF Noida Block -B AND D

Fairfox Itinfra Private · Gautam Buddha Nagar — Due soon, declared 2027-02

EYE OF Noida Block-E

Fairfox Itinfra Private · Gautam Buddha Nagar — Due soon, declared 2027-01

F Premiere

Home And Soul · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-12

F Premiere

Home And Soul · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-02

F Premiere

Home And Soul · Gautam Buddha Nagar — Past declared deadline, declared 2026-07

Fairway Zone-3

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Family HUB

Au Real Estate · Ghaziabad — Completed · Completion cert on record, declared 2028-03

Fiveo

Gygy Developers Private · Gautam Buddha Nagar — On track, declared 2029-08

Flora Casa Ansal Aquapolis

Adwik Homes Pvt · Ghaziabad — Past declared deadline, declared 2021-06

Flora Heritage

Solaris Realtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-12

Floral Pathways

Ats Grand Realtors · Ghaziabad — Due soon, declared 2027-04

Footprints FOR Commercial Use, SEC-22A

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

Forest Walk Phase- 2

Srsd Buildcon Venture · Ghaziabad — On track, declared 2030-11

Forest Walk Phase-1

Srsd Buildcon Venture · Ghaziabad — Due soon, declared 2027-06

Foreste, Phase-I (comprising Towers T1, T2, T3,t8,

Aura Buildwell Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Fortune Residency Phase -II

Vasu Infrastructure Private · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Fortune Residency Phase 3

Vasu Infrastructure Private · Ghaziabad — Completed · Completion cert on record, declared 2022-08

Fortune Residency Phase-2

Vasu Infrastructure Private · Ghaziabad — Completed · Completion cert on record, declared 2019-06

Fragrance

Ajnara India Limited · Ghaziabad — Past declared deadline, declared 2024-12

Fragrance Phase-I

Fragrance Dream Homes · Ghaziabad — Completed · Completion cert on record, declared 2026-11

French Apartments

Anthem Infrastructure Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-09

Fusion Homes

Fusion Buildtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-06

Future Estate

Futureworld Greenhomes Pvt · Gautam Buddha Nagar — Due soon, declared 2026-07

Future Estate

Futureworld Greenhomes Pvt · Gautam Buddha Nagar — Due soon, declared 2026-07

Future Estate

Futureworld Greenhomes Pvt · Gautam Buddha Nagar — Due soon, declared 2026-07

Future Estate

Futureworld Greenhomes Pvt · Gautam Buddha Nagar — Due soon, declared 2026-07

Galactic City- Cyberhub

Galactic City Private · Gautam Buddha Nagar — On track, declared 2027-12

Galactic City-Universal Tower

Homes Connect Developers · Gautam Buddha Nagar — On track, declared 2027-12

Galaxy Blue Sapphire Plaza

Gld Infraprojects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-01

Galaxy Diamond Plaza

Asteroid Shelters Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-03

Galaxy North Avenue

Galaxy International Realtech · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Galaxy North Avenue II - Towers A,B & D

Galaxy Dream Home · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-08

Galaxy Royale ,phase-2

Prithveelink Buildwell Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-11

Galaxy Royale PH1 Towers A Keshav/b Gokul/csc

Prithveelink Buildwell Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Galaxy Vega - Tower F&G AND CSC Green Arcade

Panch Tatva Promoters · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-10

Ganga, Yamuna & Hindon Enclave SID

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2019-02

Ganga, Yamuna & Hindon Enclave SID

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2019-02

Gardenia Gateway

Futec Shelters Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

Gardenia Gateway

Gardenia India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

Gardenia Gateway

Gardenia India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

Gardenia Gitanjali

Gardenia India Limited · Ghaziabad — Past declared deadline, declared 2021-10

Gaur Aero Heights

Up Township Infrastructure · Ghaziabad — Completed · Completion cert on record, declared 2027-04

Gaur Aero Mall

Up Township Infrastructure · Ghaziabad — Due soon, declared 2027-04

Gaur Atulyam

Up Township Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

Gaur Chrysalis

Gaursons Promoters Private · Gautam Buddha Nagar — On track, declared 2030-10

Gaur City Arcade

Gaursons Promoters Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-02

Gaur City Center

Gaursons Hi-Tech Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-07

Gaur City Mall

Gaursons Hi-Tech Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-06

Gaur Mulberry Mansions - FH-02

Gaursons India Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-05

Gaur Mulberry Mansions - FH-03

Gaursons Hi-Tech Infrastructure · Gautam Buddha Nagar — Past declared deadline, declared 2022-11

Gaur NYC Residences

Gaursons Hi-Tech Infrastructure · Ghaziabad — On track, declared 2029-08

Gaur Saundaryam

Gaursons Realty Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-09

Gaur Siddhartham

Gaursons India Private · Ghaziabad — Past declared deadline, declared 2022-08

Gaur Sportswood

Gaursons Sportswood Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-09

Gaur World Street

Fastidious Buildmart Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2028-03

Gaurs Runway Suites - Master Plan Commercial

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2027-02

Gayatri Aura

Gayatri Hospitality And · Gautam Buddha Nagar — Past declared deadline, declared 2024-07

Gayatri Life

Gayatri Infra Planner · Gautam Buddha Nagar — Past declared deadline, declared 2025-09

GH-06, SEC-22a, Yeida, Phase 1

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

GH-07/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

GH-08/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Past declared deadline, declared 2020-03

GH-08/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Past declared deadline, declared 2020-03

GH-08/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Past declared deadline, declared 2020-03

GH-11/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Past declared deadline, declared 2020-03

GH-11/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-03

GH-11/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-03

GH-11/75 Golf City

Aims Max Gardenia · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-03

Gh06, SEC-22d, Yeida

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Global Business Square

Srigarv Infratech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-09

Global City Walk

Garg Realtech Private · Ghaziabad — Due soon, declared 2027-06

Glory 46

Gardenia Aims Developers · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-04

Glory 46

Gardenia Aims Developers · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-04

Glory 46

Gardenia Aims Developers · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-04

Glory 46

Gardenia Aims Developers · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

Glory 46

Gardenia Aims Developers · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

Glory 46

Gardenia Aims Developers · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

Glory 46

Gardenia Aims Developers · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

GNB Phase-1

Mr Proview Realtech · Ghaziabad — Completed · Completion cert on record, declared 2018-12

GNB Phase-2 (the Great Northern Bazaar

Mr Proview Realtech · Ghaziabad — Completed · Completion cert on record, declared 2019-11

Godrej Arden

Godrej Properties · Gautam Buddha Nagar — On track, declared 2030-05

Godrej Avenue 9

Ar Landcraft Llp · Gautam Buddha Nagar — On track, declared 2030-04

Godrej Jardinia

Godrej Properties · Gautam Buddha Nagar — On track, declared 2028-12

Godrej Majesty GH-01/b,c,d,e.j AND K SEC 12 -G Noida

Godrej Properties · Gautam Buddha Nagar — On track, declared 2030-02

Godrej Nest Phase-1

Brick Rise Developers · Gautam Buddha Nagar — Past declared deadline, declared 2024-09

Godrej Nest Phase-2

Brick Rise Developers · Gautam Buddha Nagar — Past declared deadline, declared 2025-03

Godrej Nurture Phase-1

Brick Rise Developers · Gautam Buddha Nagar — Past declared deadline, declared 2025-09

Godrej Palm Retreat 1

Ace Infracity Developers · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Godrej Palm Retreat 2

Ace Infracity Developers · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Godrej Riverine

Godrej Properties · Gautam Buddha Nagar — On track, declared 2029-09

Godrej Tropical Isle

Godrej Properties · Gautam Buddha Nagar — On track, declared 2028-06

Godrej Woods Phase II

Roseberry Estate Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2027-01

Godrej Woods Phase-1

Roseberry Estate Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-07

Godrej Woods Phase-3

Roseberry Estate Llp · Gautam Buddha Nagar — On track, declared 2027-10

Gold Coast City Walk

Ansal · Ghaziabad — Due soon, declared 2026-07

Gold Square

Gky Infratech Llp · Ghaziabad — On track, declared 2030-04

Golden Grande "phase-1"

Advance Compusoft Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Golden Grande

Advance Compusoft Private · Gautam Buddha Nagar — Due soon, declared 2026-09

Golden I Phase-I

Ocean Infraheights Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

Golden I Phase-II

Ocean Infraheights Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-12

Golden I Phase-III

Ocean Infraheights Private · Gautam Buddha Nagar — Due soon, declared 2026-08

Golf Avenue II

Aims Rg Angel · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Golf Country Phase-P2

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2022-12

Golf Green Avenue

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Golf Links EWS & LIG

Landcraft Developers Private · Ghaziabad — Past declared deadline, declared 2024-01

Golf Links Phase 2

Landcraft Developers Private · Ghaziabad — Completed · Completion cert on record, declared 2022-06

Golf Links Tower 1A High END Apartments

Landcraft Developers Private · Ghaziabad — Completed · Completion cert on record, declared 2022-06

Grace World

Grace Realtech Developers · Ghaziabad — On track, declared 2028-03

Grand Carnesia AT Prateek Grand City

Prateek Realtors India · Ghaziabad — Completed · Completion cert on record, declared 2022-11

Grand Paeonia AT Prateek Grand City

Prateek Realtors India · Ghaziabad — Completed · Completion cert on record, declared 2023-03

Grandthum Phase -III

Softweb Private Limited · Gautam Buddha Nagar — On track, declared 2029-12

Grandthum Phase I

Softweb Private Limited · Gautam Buddha Nagar — Due soon, declared 2026-09

Grandthum Phase II

Softweb Private Limited · Gautam Buddha Nagar — Due soon, declared 2026-09

Grandthum Phase IV

Softweb Private Limited · Gautam Buddha Nagar — Due soon, declared 2026-09

Grandthum Phase V

Softweb Private Limited · Gautam Buddha Nagar — Due soon, declared 2026-09

Great Value Sharanam

Greatvalue Projects India · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

Greatvalue Anandam

Greatvalue Projects India · Gautam Buddha Nagar — Past declared deadline, declared 2023-03

Green Avenue

Developers Private Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

Green Reserve Tower 1 AND 2

Larsen Toubro Limited · Gautam Buddha Nagar — On track, declared 2028-05

Green Reserve Tower 3 AND 4

Larsen Toubro Limited · Gautam Buddha Nagar — On track, declared 2028-05

Green Residency

Deepak Gupta · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Green View- II Sahakari Awas Samiti Limited

Green View-Ii Sahakari · Gautam Buddha Nagar — On track, declared 2028-06

Greenarch Phase-1

New Way Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-02

Greenarch Phase-2

New Way Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-02

Greenarch Phase-3

New Way Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-01

Greenbay Golf Village

Green Bay Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Greenshire Mart

Nirala Projects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-09

Greno Complex

Shubhsiddhi Infratech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

Greno Plaza

Navdurga Buildcon Private · Gautam Buddha Nagar — On track, declared 2028-05

Group Housing Cgewho Phase I

Central Government Employees · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-05

Group Housing Cgewho Phase II

Central Government Employees · Gautam Buddha Nagar — On track, declared 2027-10

Gulmohar Enclave 1bhk AT Mandola Vihar, Ghaziabad

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2021-09

Gulmohar Enclave 2bhk AT Mandola Vihar, Ghaziabad

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2021-09

Gulmohar Garden Phase II

Svp Builders India · Ghaziabad — Completed · Completion cert on record, declared 2018-07

Gulmohur Garden

Svp Builders India · Ghaziabad — Completed · Completion cert on record, declared 2026-01

Gulmohur Greens Phase II

Friends Land Developers · Ghaziabad — Past declared deadline, declared 2019-11

Gulmohur Residency

Svp Builders India · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Gulshan Avante

Gulshan Developers Private · Gautam Buddha Nagar — On track, declared 2028-04

Gulshan Bellina

Gulshan Homz Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-07

Gulshan Botnia

Gulshan Homes And · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-02

Gulshan Dynasty

Gulshan Homz Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-03

Gulshan Empire

Gulshan Empire Estate · Ghaziabad — On track, declared 2031-02

Gulshan Ikebana -Towers L,m,n,o,p & Q

Gulshan Homes And · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2016-12

Gulshan One29

Gulshan Homes And · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-12

GYC-Galleria, Gaur Yamuna City

Gaursons Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-07

Happy Mart

Hirnot Group · Ghaziabad — On track, declared 2028-04

Happy Trails

Shridhara Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-10

Hawelia Valencia Homes Phase-I (tower D, E, F, G,

Valencia Homes (Hawelia · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Hawelia Valencia Homes Phase-II (tower-C & Commerc

Valencia Homes (Hawelia · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Hawelia Valenova Park

Hawelia Builders Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Heritage Skyward

Vrinda Homes Private · Gautam Buddha Nagar — On track, declared 2027-12

Heritage Tower K

Ajnara India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

HI Castle

Hi Castle Realtech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-06

Hillston BY Urbtech- Phase 1-Tower E&F

Golfgreen Buildcon Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-01

Hilston BY Urbtech - Tower G

Golfgreen Buildcon Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-03

Himalaya City Center Phase-1

Infraestate Pvt Ltd · Ghaziabad — Past declared deadline, declared 2025-08

Himalaya City Center Phase-2

Infraestate Pvt Ltd · Ghaziabad — Past declared deadline, declared 2025-08

Himalaya Pride

Himalaya Realestate Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Himalaya Pride

Himalaya Realestate Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Himalaya Pride

Himalaya Realestate Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Hindon Green Valley

Rishabh Buildwell Pvt · Ghaziabad — Past declared deadline, declared 2023-12

Hitaishi Heights

Dev Landcon Private · Ghaziabad — Past declared deadline, declared 2026-06

I-Thum

Grandslam Developers Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

I-Thum’s 62

Hsl Software Private · Gautam Buddha Nagar — On track, declared 2028-12

Iitl Nimbus THE Express Park View

Iitl-Nimbus The Express · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-09

Iitl Nimbus THE Express Park View (tower L,l1,m,m1

Iitl-Nimbus The Express · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Iitl-Nimbus THE Express Park View

Iitl-Nimbus The Express · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Iitl-Nimbus THE Hyde Park

Iitl-Nimbus The Hyde · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Iitl-Nimbus THE Hyde Park Noida (commercial -Hyde

Iitl-Nimbus The Hyde · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Iitl-Nimbus THE Hyde Park, Noida

Iitl-Nimbus The Hyde · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Imperial Heights

Ramprastha · Gautam Buddha Nagar — Due soon, declared 2027-01

Imperial Heights Phase-2

Ramprastha · Gautam Buddha Nagar — On track, declared 2028-10

Imperial ONE

Infrastructure · Ghaziabad — Completed · Completion cert on record, declared 2023-02

India Expo Plaza

Vinayaka Expo Plaza · Gautam Buddha Nagar — Past declared deadline, declared 2024-12

India Trade Centre

Omaxe India Trade · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-06

Individual Residential Plots, SEC-17,yeida

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2021-03

Indosam Iconic

Indosam Infra Private · Gautam Buddha Nagar — On track, declared 2031-01

Indosam75

Indosam Infra Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Indraprastha Elite Estates

Accurate Mark Serve · Ghaziabad — On track, declared 2030-02

Integrity

Ajnara India Limited · Ghaziabad — Past declared deadline, declared 2021-03

Integrity

Ajnara India Limited · Ghaziabad — Past declared deadline, declared 2022-03

Integrity

Ajnara India Limited · Ghaziabad — Past declared deadline, declared 2022-10

Intellicity @phase 4

Intellicity Business Park · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Intellicity @phase-3 Spine

Intellicity Business Park · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Intellicity@phase-1

Intellicity Business Park · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Intellicity@phase-2

Intellicity Business Park · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Iridia

Horizon Buildcon Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Iris Broadway Greno West

Ruvik Build-Tech Private · Gautam Buddha Nagar — Past declared deadline, declared 2026-06

Iris Broadway Greno West

Ruvik Build-Tech Private · Gautam Buddha Nagar — Due soon, declared 2027-03

Iris Prime

Sarena Private Limited · Ghaziabad — On track, declared 2028-01

Irish Pearls

Irish Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-10

Irish Platinum

Irish Buildcon Private · Gautam Buddha Nagar — On track, declared 2029-01

Ithum Heights Phase 2

And Tech Mach · Gautam Buddha Nagar — On track, declared 2030-07

Ithums 73

Sifal Infotech Private · Gautam Buddha Nagar — Due soon, declared 2027-04

Ithum’s Galleria

Adihm Developers Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

Ivory County Phase-1

Ambience · Gautam Buddha Nagar — On track, declared 2028-07

Ivory County Phase-2

Ambience · Gautam Buddha Nagar — On track, declared 2028-12

Ivory County Phase-3

Ambience · Gautam Buddha Nagar — On track, declared 2029-12

IVY County

Perfect Megastructure Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-06

Jade County Phase-1

Themecounty Private Limited · Gautam Buddha Nagar — On track, declared 2030-03

Jade County Phase-2

Themecounty Private Limited · Gautam Buddha Nagar — On track, declared 2031-09

Jagdish Puram

Jai Ambey Estates · Ghaziabad — Due soon, declared 2027-06

Jagdishpuram Phase 2 Grand Homz

Jai Ambey Estates · Ghaziabad — On track, declared 2030-05

Jain X Cyber City Commercial

Pooja Infotech Private · Gautam Buddha Nagar — On track, declared 2030-06

Jain X Cyber City IT Complex

Pooja Infotech Private · Gautam Buddha Nagar — On track, declared 2030-06

Jain X Cyber City IT High Rise

Pooja Infotech Private · Gautam Buddha Nagar — On track, declared 2030-06

Jain X Cyber City Residential

Pooja Infotech Private · Gautam Buddha Nagar — On track, declared 2030-06

Jaipuria Sunrise Green NH-24 Block C1

Smv Agencies Pvt · Ghaziabad — Past declared deadline, declared 2018-12

Jaipuria Sunrise Green NH-24 Block D

Smv Agencies Pvt · Ghaziabad — Past declared deadline, declared 2018-12

Jaipuria Sunrise Green NH-24 Block E

Smv Agencies Pvt · Ghaziabad — Past declared deadline, declared 2018-12

Jaipuria Sunrise Green NH-24 Block F

Smv Agencies Pvt · Ghaziabad — Past declared deadline, declared 2018-12

Jaipuria Sunrise Greens Block G AND H

Smv Agencies Pvt · Ghaziabad — Past declared deadline, declared 2021-06

Janhit Awas Yojna-Affordaval Homes

Aaradhyam Developers Private · Gautam Buddha Nagar — Past declared deadline, declared 2019-11

Jasmine Grove

Savfab Developers Private · Ghaziabad — Completed · Completion cert on record, declared 2022-12

Jasmine Grove

Savfab Developers Private · Ghaziabad — Completed · Completion cert on record, declared 2024-06

Jaypee Greens Aman, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-06

Jaypee Greens Boomerang Residences, Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Jaypee Greens Bougainvilleas, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2014-12

Jaypee Greens Country Homes-I, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2011-11

Jaypee Greens Country Homes-II, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2014-11

Jaypee Greens Garden Isles, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Jaypee Greens Greencrest Homes, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2015-01

Jaypee Greens Imperial Arcade, Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-10

Jaypee Greens Kalypso Court, Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-02

Jaypee Greens Kasa Isles, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — On track, declared 2027-10

Jaypee Greens Kasablanca, Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Jaypee Greens Kassia I, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Jaypee Greens Kensignton Boulevard Apartments, NOI

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-12

Jaypee Greens Kensington Park Apartments, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-12

Jaypee Greens Klassic - A, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-03

Jaypee Greens Klassic - D, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-09

Jaypee Greens Klassic Arcade, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-04

Jaypee Greens Klassic Corporate, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Jaypee Greens Knight Court, Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-05

Jaypee Greens Kosmos - A, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-09

Jaypee Greens Kosmos - B, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-09

Jaypee Greens Kosmos - C, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-09

Jaypee Greens Krescent Homes, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Jaypee Greens Krowns, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2012-02

Jaypee Greens Kube, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Jaypee Greens Orchards, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Jaypee Greens Pavilion Heights Arcade, Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-04

Jaypee Greens Sportsville, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

Jaypee Greens SUN Court - B, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Jaypee Greens Town Homes, Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-02

Jaypee Greens Villa Country Homes - II, Sdz, YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-09

Jaypee Greens Villa Greencresthomes,sdz YEW

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

Jaypee Greens Wish Point, Noida

Jaypee Infratech Limited · Gautam Buddha Nagar — On track, declared 2028-06

Jaypee Greens Yamuna Vihar, Mirzapur

Jaypee Infratech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2015-01

Jaypee Greens, E-1/14 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-03

Jaypee Greens, E-1/3 Land 1, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-02

Jaypee Greens, E-10 Land 1, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-02

Jaypee Greens, E-12 Land 1, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-02

Jaypee Greens, E-3/12a Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-08

Jaypee Greens, E-4/12a Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-03

Jaypee Greens, E-4/7 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-08

Jaypee Greens, E-6 Land2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2018-08

Jaypee Greens, E-6/4 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-09

Jaypee Greens, E-6/7 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-08

Jaypee Greens, E-9 Land 1, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-02

Jaypee Greens, SV-14 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-02

Jaypee Greens, SV-24 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Jaypee Greens, V-04 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-10

Jaypee Greens, V-07 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-02

Jaypee Greens, V-08 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-10

Jaypee Greens, V-2/7 Land 1, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-02

Jaypee Greens, V-4/7 Land 1, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Past declared deadline, declared 2018-08

Jaypee Greens, V-5 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-02

Jaypee Greens, V-5/9 Land 2, Greater Noida

Jaiprakash Associates Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-08

JC World Hospitality Private Limited

Rita Dixit · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

JKG Palm Court Phase-I

Jkg Construction Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2019-06

JKG Palm Court Phase-II

Jkg Construction Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2020-11

JM Florence

Housing Ltd · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-08

Jmdr Arihant Green

Bliss Town Developers · Gautam Buddha Nagar — On track, declared 2027-12

JNC Greenwoods

Constructions Private Limited · Ghaziabad — Past declared deadline, declared 2018-07

JNC THE Park

Constructions Private Limited · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

JOP Stella

Jop Infra Pvt · Ghaziabad — On track, declared 2029-06

JP Parks

Ganadhi Pati Construction · Gautam Buddha Nagar — On track, declared 2029-07

K D Housing

Housing · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

Kadamba Kunjh

Kadamba Estates Private · Ghaziabad — On track, declared 2031-03

Kailasha Arcade 1

Baba Construction Private · Ghaziabad — Due soon, declared 2027-02

Kailasha Arcade 2

Baba Construction Private · Ghaziabad — Due soon, declared 2027-02

Kailasha Enclave

Baba Construction Private · Ghaziabad — Due soon, declared 2026-11

Kailasha Estate

Baba Construction Private · Ghaziabad — On track, declared 2030-01

Kalpataru Vista

Kalpataru Urbanscape Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-06

Kamakhya Cross Walk

Ht Kamakhya Developers · Gautam Buddha Nagar — On track, declared 2029-05

Karyan Nine

Aih Realty Private · Ghaziabad — On track, declared 2031-03

Karyan Square

Karyan Infracom Llp · Ghaziabad — On track, declared 2028-03

Karyan Streetwalk

Karyan Infratech Llp · Ghaziabad — Completed · Completion cert on record, declared 2026-11

Kasna Plaza PH 1

Saffron Builders Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-12

Kaveri City Centre

Kaveri Techobuild Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-02

Kaveri City Centre-2

Kaveri Elite Infra · Gautam Buddha Nagar — On track, declared 2031-01

KB Central

Avora Builders Private · Gautam Buddha Nagar — On track, declared 2031-03

KB Complex

Shree Kunj Bihariji · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

KB India Mart

Shree Kunj Bihariji · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-11

KB West Walk

Shree Kunj Bihariji · Gautam Buddha Nagar — On track, declared 2030-10

Kbnows Apartment

Rudra Buildwell Constructions · Gautam Buddha Nagar — Past declared deadline, declared 2018-06

Kdmg Central Plaza

Analox Town Planners · Gautam Buddha Nagar — On track, declared 2028-08

KDP Grand Savanna Block H, I

Kdp Infrastructure Private · Ghaziabad — Past declared deadline, declared 2019-07

Khelgaon

Ajnara India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2023-01

Khelgaon

Ajnara India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Khelgaon

Ajnara India Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-07

Kings Park

Today Homes And · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Kingswood Court Phase 1 Completed / Kings Avenue P

Kingswood Infrastructure Private · Ghaziabad — Past declared deadline, declared 2018-09

Kiosks

Sare Saamag Realty · Ghaziabad — Past declared deadline, declared 2018-12

Klassic Homez

Paras Developers Consortium · Ghaziabad — Past declared deadline, declared 2026-06

KM Residency

Promoters Private Limited · Ghaziabad — Past declared deadline, declared 2019-12

KM Zinnia Hotel AND Serviced Appartment

Kaj Infrastructure Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-09

Kourtyard

Laxmi Town Planners · Gautam Buddha Nagar — On track, declared 2030-09

Kumar Golf Vista

Keltech Infrastructure Limited · Ghaziabad — Past declared deadline, declared 1900-01

Kumar Imperial Greens

Keltech Infrastructure Limited · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

KVD Windpark

Kv Developers Private · Gautam Buddha Nagar — On track, declared 2029-03

KW Delhi 6

Kw Homes Pvt · Ghaziabad — Completed · Completion cert on record, declared 2020-12

LA Casa Ansal Aquapolis

Adwik Homes Pvt · Ghaziabad — Past declared deadline, declared 2023-11

LA Galaxia

Newtech Promoters And · Gautam Buddha Nagar — Past declared deadline, declared 2024-04

LA Gracia

Newtech Shelters Private · Ghaziabad — Past declared deadline, declared 2017-12

LA Palacia

Newtech La Palacia · Gautam Buddha Nagar — Past declared deadline, declared 2024-06

LA Residentia

La Residentia Developers · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

LA Royale

Mks Infratech Private · Ghaziabad — Completed · Completion cert on record, declared 2017-12

LA Solara,phase-1

Belgravia Projects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

LA Solara,phase-2

Belgravia Projects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

Lakshya Aquapolis

Lakshya Realinfra Pvt · Ghaziabad — Past declared deadline, declared 2022-02

Landcraft Metro Homes

Rs Landcraft Llp · Ghaziabad — Completed · Completion cert on record, declared 2022-09

Landcraft Metro Homes Phase-4

Rs Landcraft Llp · Ghaziabad — On track, declared 2027-07

Landcraft Metrohomes Phase-2

Rs Landcraft Llp · Ghaziabad — Completed · Completion cert on record, declared 2024-02

Landcraft Metrohomes Phase-3

Rs Landcraft Llp · Ghaziabad — Completed · Completion cert on record, declared 2026-09

Laxmi Villas

Ascent Developwell Pvt · Ghaziabad — Due soon, declared 2027-03

LE Garden

Ajnara Realtech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

LE Garden

Ajnara Realtech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-10

LE Garden

Ajnara Realtech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2025-05

LE Garden

Ajnara Realtech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

LE Garden

Ajnara Realtech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Legacy BY Gaurs

Golf Horizon Llp · Gautam Buddha Nagar — On track, declared 2029-09

Levante City Vista

Fastech Globe Realtors · Gautam Buddha Nagar — On track, declared 2030-11

Levante Metro Walk

Levante Projects · Gautam Buddha Nagar — On track, declared 2030-12

Lifestyle Central

Dtr Developers Llp · Gautam Buddha Nagar — On track, declared 2031-04

LIG Zone I

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2022-01

LIG Zone-3

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

LIG Zone-II

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2022-01

Lig/ews Block AT Sector-3, Aditya World City, IN

Agarwal Associates (Promoters) · Ghaziabad — Completed · Completion cert on record, declared 2023-01

LOK Sabha Employees Cooperative Housing Society

Lok Sabha Employees · Ghaziabad — Past declared deadline, declared 2023-11

London Mart

Mart Promoters Pvt · Gautam Buddha Nagar — On track, declared 2028-02

Lord Krishna Mart

Saviour Builders Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

Lord Krishna Medlley

Saviour Infra Private · Gautam Buddha Nagar — Past declared deadline, declared 2026-03

Lords

Kindle Developers Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Lotus 300 (tower 3-6, Club AND Commercial Building

Hacienda Projects Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Lotus Arena

Arena Superstructures Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Lotus Arena II

Piyush It Solutions · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Lotus Boulevard T-28, T-29 AND T-30

Granite Gate Properties · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Lotus Isle

Three Properties Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Lotus Panache (tower 1-4, 14-31, Club AND Commerci

Granite Gate Properties · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Lotus Yardscape Phase I

Three Green Developers · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Lotus Zing, Club AND Commercial Build

Three Projects Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Luxuria Estate Phase Commercial

Agarwal Associates (Promoters) · Ghaziabad — Completed · Completion cert on record, declared 2021-12

M3M J AND C

Mayfairsky Estates Private · Gautam Buddha Nagar — On track, declared 2030-07

M3M THE Cullinan

Lavish Buildmart Pvt · Gautam Buddha Nagar — On track, declared 2028-04

M3M THE Cullinan II

Lavish Buildmart Pvt · Gautam Buddha Nagar — On track, declared 2030-07

M3M THE Line

Skyline Propcon Private · Gautam Buddha Nagar — On track, declared 2028-07

Madhuban Bapudham Scheme Pocket D Commercial Complex

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2022-07

Magnum Oasis Green

Rms Builders Private · Ghaziabad — Past declared deadline, declared 2022-02

Magnum Star Cruise Mall

Pkg Estates Private · Ghaziabad — Past declared deadline, declared 2018-11

Mahagun "marina Wwalk" Mall

Mahagun Real Estate · Gautam Buddha Nagar — Past declared deadline, declared 2026-06

Mahagun Manorial

Mahagun (India) Pvt · Gautam Buddha Nagar — Due soon, declared 2027-06

Mahagun Mantra 1

Dhanya Promoters Private · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

Mahagun Mantra II

Hebe Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Mahagun Meadows

Logix Heights Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Mahagun Medalleo

Mahagun Infratech Private · Gautam Buddha Nagar — On track, declared 2029-09

Mahagun Mezzaria

Nexgen Infracon Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-09

Mahagun Mirabella

Golfgreen Infra Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Mahagun Mmillennia

Mahagun Housing And · Ghaziabad — On track, declared 2029-12

Mahagun Montage

Mahagun (India) Pvt · Ghaziabad — On track, declared 2028-06

Mahagun MY Laagoon Phase 1

Aura Infrabiz Llp · Gautam Buddha Nagar — On track, declared 2029-04

Mahagun Mywoods

Mahagun (India) Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-09

Mahagunpuram - Phase II

Mahagun Real Estate · Ghaziabad — Completed · Completion cert on record, declared 2016-11

Mangal Heights

Mangal Buildwell Pvt · Ghaziabad — Past declared deadline, declared 2026-06

Mangalya Ophira

Mangalya Buildtech Private · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Manju J Homes India Limited

Manju Homes India · Ghaziabad — Past declared deadline, declared 2020-03

Manorath

Mascot Homes Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Marina Suites

Skyhigh Infraprojects Private · Ghaziabad — Completed · Completion cert on record, declared 2022-02

Marina Suites

Skyhigh Infraprojects Private · Ghaziabad — Past declared deadline, declared 2022-12

Master Plan Commercial - Gaur Yamuna City

Gaursons Realtech Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-10

MAX Towers

Wise Zone Builders · Gautam Buddha Nagar — Past declared deadline, declared 2021-10

Maxblis Grand Kingiston

Maxblis Construction Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Maxblis Grand Wellington

Maxblis Construction Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Maxblis White House

Maxblis Construction Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Maxblis White House II

Maxblis Construction Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-01

Mayfair Residency

Super City Developers · Gautam Buddha Nagar — On track, declared 2028-12

Mayflower AT THE Prestige City

Prestige · Ghaziabad — On track, declared 2029-11

MCC Signature Heights - Phase I

Annika Promoters Private · Ghaziabad — Completed · Completion cert on record, declared 2022-08

MCC Signature Heights - Phase II

Annika Promoters Private · Ghaziabad — Completed · Completion cert on record, declared 2022-08

MCC Signature Heights - Phase III

Annika Promoters Private · Ghaziabad — Completed · Completion cert on record, declared 2023-08

Meadows Vista

Value Infracon India · Ghaziabad — On track, declared 2029-03

Media Majestic Tower

Flat Owners Association · Ghaziabad — Past declared deadline, declared 2019-09

Meghdutam Encore

Palm Developers Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Mehak Jeevan

Mehak Infrastructure Private · Ghaziabad — Completed · Completion cert on record, declared 2023-04

Mentis

Gygy Infradesign Pvt · Gautam Buddha Nagar — On track, declared 2028-03

Metro Suites Bellavie

Metro Suites Homes · Ghaziabad — On track, declared 2028-12

Metro Suites Bliss

Srb Consortium (Realcon) · Ghaziabad — Past declared deadline, declared 2019-06

Metro Suites Glitz

Metro Suites Homes · Ghaziabad — Past declared deadline, declared 2023-06

MGI Gharaunda

Kdp Buildwell Private · Ghaziabad — Past declared deadline, declared 2017-12

MID Point Mart

Shalviya Realtors Private · Ghaziabad — Due soon, declared 2026-08

Migsun Alpha Central PNO C2 CB Alpha II GN, UP

Superemo Infratech Private · Gautam Buddha Nagar — On track, declared 2030-03

Migsun Atharva

Mahaluxmi Buildtech Limited · Ghaziabad — Completed · Completion cert on record, declared 2024-12

Migsun Atharva - Migsun MI Gente - Migsun Estella

Mahaluxmi Buildtech Limited · Ghaziabad — Completed · Completion cert on record, declared 2024-12

Migsun Central Market

Ansal · Gautam Buddha Nagar — On track, declared 2028-10

Migsun Delta Street

Mahaluxmi Infrahome Pvt · Gautam Buddha Nagar — On track, declared 2029-09

Migsun Galleria

Royalgolf Link City · Gautam Buddha Nagar — Past declared deadline, declared 2025-11

Migsun Green Mansion

Mahaluxmi Buildtech Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Migsun Jorbagh

Royalgolf Link City · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Migsun Kiaan

Mahaluxmi Buildtech Consortium · Ghaziabad — Past declared deadline, declared 2024-12

Migsun Nehru Place 1

Ansal · Gautam Buddha Nagar — On track, declared 2028-10

Migsun Nehru Place 2

Ansal · Gautam Buddha Nagar — On track, declared 2028-10

Migsun Nehru Place 3

Ansal · Gautam Buddha Nagar — On track, declared 2028-10

Migsun Roof

Mahaluxmi Realtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2022-12

Migsun Twiinz

Hotels Resorts Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-07

Migsun Ultimo

Mahaluxmi Infrahome Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-12

Migsun Vilaasa

Yamuna Builtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-12

Milan Earth

Milan Infrastructures And · Ghaziabad — Past declared deadline, declared 2018-10

Miraabilis

Ramprastha · Ghaziabad — On track, declared 2029-10

Mirage Phase I

Imperia · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Mirage Phase II

Imperia · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Monk Monastery

Mahesha Infravalley Private · Ghaziabad — Completed · Completion cert on record, declared 2024-12

Morpheus Pratiksha

Morpheusdevelopers Pvt Ltd · Gautam Buddha Nagar — On track, declared 2030-02

Moti City

Techman Buildwell Pvt · Ghaziabad — Past declared deadline, declared 2021-12

Moti City Phase-2

Techman Buildwell Pvt · Ghaziabad — On track, declared 2029-06

Moti Residency

Techman Buildwell Pvt · Ghaziabad — Past declared deadline, declared 2013-10

Moti Residency Phase II

Techman Buildwell Pvt · Ghaziabad — Past declared deadline, declared 2022-06

Moti Residency- Phase II

Techman Buildwell Pvt · Ghaziabad — On track, declared 2030-09

MR Homes Heritage Tower

Mr Homes · Ghaziabad — Past declared deadline, declared 2020-03

Mulberry AT THE Prestige City

Prestige · Ghaziabad — On track, declared 2029-11

Navrang Square

Renowned Buildtech Private · Ghaziabad — On track, declared 2027-08

NCR Auriel Towne

Shubh Advisors Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-03

NCR Monarch

Jss Buildcon Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-12

Neotown Phase-1

Patel Advance Jv · Gautam Buddha Nagar — Due soon, declared 2026-11

Neotown Phase-2

Patel Advance Jv · Gautam Buddha Nagar — Due soon, declared 2026-11

Neotown Phase-3

Patel Advance Jv · Gautam Buddha Nagar — Past declared deadline, declared 2024-04

Neoworld

Logix Infra Developers · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Nilay Square

Nilay Infratech Private · Gautam Buddha Nagar — On track, declared 2030-01

Nilaya Greens

Nilaya Infra Private · Ghaziabad — Completed · Completion cert on record, declared 2024-08

Nimbus THE Palm Village

Iitl- Nimbus The · Gautam Buddha Nagar — On track, declared 2028-03

Nipun Saffron Valley

Nipun Builders Developers · Ghaziabad — Completed · Completion cert on record, declared 2019-06

Nirala - BIZ Park

Nirala Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-05

Nirala Aspire PH-IV

Iresh Nirala Gold · Gautam Buddha Nagar — Past declared deadline, declared 2024-12

Nirala Aspire PH1

Nirala Housing Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-09

Nirala Aspire Phase-II

G3 Aspire Nirala · Gautam Buddha Nagar — Past declared deadline, declared 2025-02

Nirala Diadem

Parth Builtech Private · Gautam Buddha Nagar — On track, declared 2030-10

Nirala Estate Phase-II

Nirala Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-05

Nirala Estate Phase-III

Nirala Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-12

Nirala Estate Phase-IV

Nirala Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-12

Nirala Estate Phase-V

Nirala Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2027-11

Nirala Gateway

Parth Builtech Private · Gautam Buddha Nagar — On track, declared 2030-04

Nirala Greenshire PH-1

Nirala Projects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-03

Nirala Greenshire PH-II

Nirala Projects Private · Gautam Buddha Nagar — Past declared deadline, declared 2026-01

Nirala Trio

Nirala World Residency · Gautam Buddha Nagar — On track, declared 2028-12

Nirvana Homes

Urban Constructor Llp · Ghaziabad — On track, declared 2027-11

Nitya Homes

Nitya Realtech Pvt · Ghaziabad — Past declared deadline, declared 2022-03

Nobility

Homekraft Infra Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2027-01

Noida Cyber HUB

Noida Cyber Park · Gautam Buddha Nagar — Past declared deadline, declared 2026-05

Noida ONE --Tower A

Pioneer Eserve Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-12

Noida World ONE - Phase 1

Cbs International Projects · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-11

Noida World ONE - Phase 2

Cbs International Projects · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-11

Noida World ONE - Phase 3

Cbs International Projects · Gautam Buddha Nagar — Past declared deadline, declared 2023-03

Noida World ONE - Phase 5

Cbs International Projects · Gautam Buddha Nagar — Past declared deadline, declared 2022-10

Noida World ONE Phase - 4

Cbs International Projects · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Northwind Sanctuary Plot NO. 7, Sector-PI, GR. Noida

Northwind Estates Private · Gautam Buddha Nagar — On track, declared 2030-01

Novena Green

Homes Private Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2027-06

Ntpc Anandam Plaza

Sharda Infra Ntpc · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

NX ONE

Sai It Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2027-11

Nxone - ARK

Sai It Pvt · Gautam Buddha Nagar — On track, declared 2029-10

Nxone - Hive

Sai It Pvt · Gautam Buddha Nagar — Due soon, declared 2026-12

Oakwood AT THE Prestige City

Prestige · Ghaziabad — On track, declared 2029-11

Oasis Grandstand

Oasis Realtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-03

Oasis Grandstand Phase-2

Oasis Realtech Pvt · Gautam Buddha Nagar — On track, declared 2029-01

Oasis Venetia Heights

Oasis Buildmart India · Gautam Buddha Nagar — Past declared deadline, declared 2018-06

Officer City 1

Proview Infrastructure Pvt · Ghaziabad — Past declared deadline, declared 2022-03

Officer City-2

Mr Proview Realtech · Ghaziabad — Completed · Completion cert on record, declared 2020-09

Officer City-2 Phase-2

Mr Proview Realtech · Ghaziabad — Past declared deadline, declared 2021-09

ONE Estate

Krishna Apra Projects · Gautam Buddha Nagar — On track, declared 2030-03

ONE FNG

Ss Technopark Private · Gautam Buddha Nagar — On track, declared 2028-08

Onyx Blue

Splendor Information Technology · Gautam Buddha Nagar — On track, declared 2030-06

Opulence Phase A

Saha Estate Developers · Gautam Buddha Nagar — Past declared deadline, declared 2023-10

Opulence Phase-I

Saha Estate Developers · Gautam Buddha Nagar — Due soon, declared 2027-03

Opus

Jindalsons Infratex Pvt · Ghaziabad — Completed · Completion cert on record, declared 2027-04

Orion Homes

Divyansh Uppal Llp · Ghaziabad — On track, declared 2029-05

Orion ONE 32

Wellgrow Infotech Private · Gautam Buddha Nagar — Due soon, declared 2026-12

Orizzonte

Concept Horizon Infra · Gautam Buddha Nagar — On track, declared 2028-10

Orizzonte

Concept Horizon Infra · Gautam Buddha Nagar — On track, declared 2028-10

Oxirich Avenue

Oxirich Construction Pvt · Ghaziabad — Past declared deadline, declared 2018-03

Oxirich Square ONE

Oxirich Construction Pvt · Ghaziabad — Past declared deadline, declared 2025-03

OXY HI Street

Oxy Heightz Infra · Ghaziabad — On track, declared 2028-04

OXY Homez

Super Realtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-03

Oyster Walk

Srsd Infrastructure Venture · Ghaziabad — On track, declared 2031-01

Ozone Classik

Anthem Yash Kirti · Ghaziabad — Completed · Completion cert on record, declared 2027-05

Page 3 Noida

Page3 Buildtech Private · Gautam Buddha Nagar — Due soon, declared 2026-10

Page Three Residences

Home And Soul · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-09

Palm Drive

Asm Management Consultants · Ghaziabad — Completed · Completion cert on record, declared 2023-12

Palm Drive Commercial East

Kirtimaan Constructions Private · Ghaziabad — Completed · Completion cert on record, declared 2023-12

Palm Drive Commercial West

Kirtimaan Constructions Private · Ghaziabad — Completed · Completion cert on record, declared 2023-12

Palm Heights

Palm Infrahomes Private · Ghaziabad — Past declared deadline, declared 2020-12

Palm Olympia PH 2

Sam India Abhimanyu · Gautam Buddha Nagar — On track, declared 2028-04

Palm Olympia PH 3

Sam India Abhimanyu · Gautam Buddha Nagar — On track, declared 2028-04

Palm Resort

Mrjv Construction Company · Ghaziabad — Completed · Completion cert on record, declared 2026-12

Panchsheel Greens

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2020-09

Panchsheel Greens - II

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-11

Panchsheel Greens - II

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Due soon, declared 2026-11

Panchsheel Greens - II

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-11

Panchsheel Greens -II

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-06

Panchsheel Greens Phase - 1 (B1 TO B3,f4 TO F6 & C

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-05

Panchsheel Greens-Ii(tower - E1 TO E4,commercial,n

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-11

Panchsheel Hynish Phase -1

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-05

Panchsheel Hynish Phase -3

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-01

Panchsheel Hynish Phase-2

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-10

Panchsheel Park Phase -3

Ar Infratech Crossings · Ghaziabad — Completed · Completion cert on record, declared 2023-05

Panchsheel Park Phase 2

Ar Infratech Crossings · Ghaziabad — Completed · Completion cert on record, declared 2026-06

Panchsheel Park-Phase 1

Ar Infratech Crossings · Ghaziabad — Completed · Completion cert on record, declared 2023-05

Panchsheel Pebbles

Panchsheel Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2019-08

Panchsheel Pinnacle Phase - 1 PA

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2020-09

Panchsheel Pinnacle Phase-2part OF Panc

Panchsheel Buildtech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-02

Panchsheel Pratistha Phase - 1

Valuent Infradevelopers Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-02

Panchsheel Pratistha Phase - 2 (tower T1 TO T3 , C

Valuent Infradevelopers Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-08

Panchsheel Pratistha Phase - 3

Valuent Infradevelopers Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-11

Panchsheel Prime 390 Phase - 2 (block - 19 TO 23,2

Panchsheel Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2023-07

Panchsheel Prime 390 Phase - 3

Panchsheel Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2024-09

Panchsheel Prime 390 Phase -1 (block 1 TO 5 & 14 T

Panchsheel Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2020-12

Panchsheel Prime 390 Phase -4 (block-24,25,31 TO 3

Panchsheel Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2024-09

Panchsheel Wellington

Panchsheel Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2025-09

Panchtatva Phase-1

Sanjeev Kumar · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Paradise Crystal Zone I

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Paradise Crystal Zone II

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Paramount Emotions

Paramount Propbuild Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Paras Avenue

Ambit Buildwell Pvt · Gautam Buddha Nagar — On track, declared 2027-09

Paras One33

Admired Height Projects · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-05

Park Avenue

Aig Infratech India · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Park Lane AT Godrej Golf Link

Ar Landcraft Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

Park Town Commercial Complex Phase 1

Park Town Complex · Ghaziabad — Completed · Completion cert on record, declared 2022-04

Park Town Commercial Complex Phase 2

Park Town Complex · Ghaziabad — Completed · Completion cert on record, declared 2022-04

Park Town Commercial Complex Phase 3

Park Town Complex · Ghaziabad — Completed · Completion cert on record, declared 2022-04

Parsvnath Palacia Phase-I

Parsvnath Developers Limited · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Parsvnath Palacia Phase-II

Parsvnath Developers Limited · Gautam Buddha Nagar — Past declared deadline, declared 2022-08

Parsvnath Privilege Phase-1

Parsvnath Developers Limited · Gautam Buddha Nagar — Past declared deadline, declared 2020-01

Parsvnath Privilege Phase-II

Parsvnath Developers Limited · Gautam Buddha Nagar — Past declared deadline, declared 2019-07

Parsvnath Privilege Phase-III

Parsvnath Developers Limited · Gautam Buddha Nagar — Past declared deadline, declared 2022-01

Parsvnath Privilege Phase-IV

Parsvnath Developers Limited · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Parsvnath Regalia - II Phase

Parsvnath Developers Limited · Ghaziabad — Past declared deadline, declared 2018-12

Parsvnath Sterling

Parsvnath Developers Limited · Ghaziabad — Completed · Completion cert on record, declared 2018-11

Parx Laureate

Laureate Buildwell Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 1900-01

Pathway Homes

Mayank Jain · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Pearl Court Tower A-H, Phase-1 Completed,p

Ramprastha · Ghaziabad — Past declared deadline, declared 2022-09

Pearl Residency

Delhi Metro Welfare · Ghaziabad — Past declared deadline, declared 2023-06

Pebble Court

Jaypee Infratech Limited · Gautam Buddha Nagar — Due soon, declared 2026-07

Pebbles Prolease PVT LTD (heartbeat City

Ashish Bajpai · Gautam Buddha Nagar — Past declared deadline, declared 2022-04

PI City Center

Govinda Housing Limited · Gautam Buddha Nagar — On track, declared 2030-01

Pinnacle Tower

Vishal Products Pvt · Ghaziabad — Completed · Completion cert on record, declared 2016-09

Pious Hideaways

Homekraft Infra Private · Gautam Buddha Nagar — Due soon, declared 2026-09

Pious Orchards

Homekraft Infra Private · Gautam Buddha Nagar — On track, declared 2028-09

Platinum 321

Dd Developers · Ghaziabad — Past declared deadline, declared 2020-09

Platinum Height

Ramprastha · Ghaziabad — Completed · Completion cert on record, declared 2018-02

Platinum Premier

Ramprastha · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Plot Zone I

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

Plot Zone II

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

Plot Zone III

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2024-08

Plot Zone IV

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2024-08

Plot Zone V

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2026-02

Prabhat Heights

Forever Infrastructure Private · Ghaziabad — Completed · Completion cert on record, declared 2024-12

Prateek Aurelia

Prateek Realtors India · Ghaziabad — On track, declared 2029-06

Prateek Canary

Strongbiz Propbuild Private · Gautam Buddha Nagar — On track, declared 2027-10

Prateek Edifice

Prateek Infraprojects India · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-09

Prateek Grand Begonia

Prateek Realtors India · Ghaziabad — On track, declared 2029-06

Prateek Grand Begonia

Prateek Realtors India · Ghaziabad — On track, declared 2029-06

Prateek Grand City Mall

Prateek Realtors India · Ghaziabad — On track, declared 2030-11

Prateek Grand City Walk

Prateek Realtors India · Ghaziabad — Past declared deadline, declared 2021-06

Premeria

Imperia · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Presidential Villas

Ar Landcraft Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-03

Presithum Phase II

Presidency Infraheights Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Presithum-Presidency Heights

Presidency Infraheights Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-09

Prestige Height

Prestige · Ghaziabad — Completed · Completion cert on record, declared 2019-12

Prideville

Imperia · Gautam Buddha Nagar — On track, declared 2028-07

Prime Tower, LE Garden

Ajnara Realtech Limited · Gautam Buddha Nagar — Past declared deadline, declared 2022-11

Pristine Avenue

Geotech Homz Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

Proview Malls

Proview Malls Pvt · Ghaziabad — Completed · Completion cert on record, declared 2017-12

Province D Olympia

Ats Realty Private · Gautam Buddha Nagar — On track, declared 2028-03

Purvanchal Royal City

Purvanchal Projects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-03

Purvanchal Royal City

Purvanchal Projects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

Purvanchal Skyline Vista

Purvanchal Projects Private · Gautam Buddha Nagar — On track, declared 2028-10

Purvanchal Sunbliss Plot NO. GH-1a/1 Sector 22D Yeida

Purvanchal Projects Private · Gautam Buddha Nagar — On track, declared 2030-01

RA Convenient Shops

Ramprastha · Ghaziabad — On track, declared 2030-03

RA Sector Shopping

Ramprastha · Ghaziabad — On track, declared 2030-03

Radha Gobind Palace

Radhagovind Tradelink Pvt · Ghaziabad — Past declared deadline, declared 2025-10

RAJ Empire

Javin Construction Private · Ghaziabad — Completed · Completion cert on record, declared 2025-02

RAJ Empire

Javin Construction Private · Ghaziabad — Completed · Completion cert on record, declared 2018-01

RAJ Garden City

Edge Dwarika Jv · Ghaziabad — Past declared deadline, declared 2019-06

RAJ Garden City

Edge Dwarika Jv · Ghaziabad — Past declared deadline, declared 2019-06

RAJ Garden City

Edge Dwarika Jv · Ghaziabad — Past declared deadline, declared 2019-06

RAJ Hans Residency

Raj Hans Infratech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-09

RAJ Residency / Raksha Addela

Jindal Promoters Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-03

RAJ Villas

Tech Associate Pvt · Ghaziabad — Past declared deadline, declared 2021-09

Rajnagar Residency

Mittals Infratech Private · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Rama Heights

Megastructures Limited · Ghaziabad — Past declared deadline, declared 2022-12

Ramprastha Avenue

Ramprastha · Ghaziabad — On track, declared 2028-05

Ratan Pearls

Ratan Buildtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-06

Ratan Pearls

Ratan Buildtech Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-12

RED Apple Residency

Idea Builders Private · Ghaziabad — Past declared deadline, declared 2018-04

Regency Park, Greater Noida, West Phase-I (compris

Aarcity Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

Regency Park, Greater Noida, West Phase-II (compri

Aarcity Infrastructure Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-03

Renox Thrive

Nivas Promoters Private · Gautam Buddha Nagar — On track, declared 2029-04

Residential Plots

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2022-06

Residential Plots 608 Numbers OF Different Types IN Sector-23, Mandola Vihar Yojna, Ghaziabad

Awas Evam Vikas · Ghaziabad — On track, declared 2029-01

Residential Scheme FOR Nandgram Village Noor Nagar Ghaziabad

Ghaziabad Development Authority · Ghaziabad — Past declared deadline, declared 2026-05

RG Luxury Homes

Rajesh Projects (India) · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-03

RG Luxury Homes - Tower A, F & M

Rajesh Projects (India) · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-03

RG Luxury Homes - Tower B, C, D & E

Rajesh Projects (India) · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-03

RG Luxury Homes-4

Rajesh Projects (India) · Gautam Buddha Nagar — Past declared deadline, declared 2026-06

RG Mirage Tower L

Rg Residency Private · Gautam Buddha Nagar — Past declared deadline, declared 2026-06

RG Mirage Tower M

Rg Residency Private · Gautam Buddha Nagar — Past declared deadline, declared 2026-06

RG Residency Tower - P

Rg Residency Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2020-09

RG Square Phae-2

Rajesh Projects (India) · Gautam Buddha Nagar — Past declared deadline, declared 2023-03

RG Square Phase-1

Rajesh Projects (India) · Gautam Buddha Nagar — Past declared deadline, declared 2022-09

RGS Pleiaddes Phase-1

Kvir Towers Private · Gautam Buddha Nagar — On track, declared 2029-09

RGS Pleiaddes Phase-2

Kvir Towers Private · Gautam Buddha Nagar — On track, declared 2029-09

RGS Pleiaddes Phase-3

Kvir Towers Private · Gautam Buddha Nagar — On track, declared 2029-09

RGS Pleiaddes Phase-4

Kvir Towers Private · Gautam Buddha Nagar — On track, declared 2029-09

RGS Pleiaddes Phase-5

Kvir Towers Private · Gautam Buddha Nagar — On track, declared 2029-09

Rhythm County

Futureworld Greenhomes Pvt · Gautam Buddha Nagar — On track, declared 2027-07

Rhythm County

Futureworld Greenhomes Pvt · Gautam Buddha Nagar — Due soon, declared 2026-07

Rhythm County

Futureworld Greenhomes Pvt · Gautam Buddha Nagar — Due soon, declared 2026-07

Rise Golf Villas

Rise Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2025-11

Rise Organic Ghar Phase 1

Rise Projects Pvt · Ghaziabad — Completed · Completion cert on record, declared 2025-06

Rise Organic Homes Phase 1

Rise Projects Pvt · Ghaziabad — Completed · Completion cert on record, declared 2022-03

Rise Organic Homes Phase 2

Rise Projects Pvt · Ghaziabad — Completed · Completion cert on record, declared 2024-12

Rise Resort Residences Phase-I

Rise Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-10

Rise Retailia

Rise Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2025-11

Rise Shoplex

Rise Infradevelopers Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-01

Rise Sports Villas

Rise Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-12

Rise Sports Villas , Super 30 Villas

Rise Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-12

Rise Square - Palm Street, Madison Square, Broadway Street

Rise Projects Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-01

River Height Tower - 18

Dhanversha Builders Pvt · Ghaziabad — Past declared deadline, declared 2018-01

River Heights Tower 17

Carol Infrastructure Private · Ghaziabad — Completed · Completion cert on record, declared 2018-05

RMS Plaza

Rms Builders Private · Ghaziabad — Past declared deadline, declared 2015-04

Robust High Street

Robust Energy And · Ghaziabad — On track, declared 2030-05

Rosemont Residency

Park Town Complex · Ghaziabad — On track, declared 2031-02

Royal Court

Strategic Developers Private · Gautam Buddha Nagar — Past declared deadline, declared 2019-03

Royal Crest

Cnm Infratech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Royal Height

Future Homes · Ghaziabad — Past declared deadline, declared 2017-12

Royal Nest

Omkar Nests Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Royal Walkway

Vidhi Infrabuild Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-12

Royce Vaishali

Royce Developers Pvt · Ghaziabad — Completed · Completion cert on record, declared 2021-06

RPS 05/2021

Yamuna Expressway Industrial · Gautam Buddha Nagar — Due soon, declared 2027-05

RPS-01 Sector-2

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

RPS-02 Zeta-2

Greater Noida Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

RPS-02, SEC-22D

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2021-03

RPS-04/2021

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2026-05

RPS-06/2022

Yamuna Expressway Industrial · Gautam Buddha Nagar — On track, declared 2027-12

Rps01,rrps01 AND Rrps02 ,yeida

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2024-07

Rps07/2023

Yamuna Expressway Industrial · Gautam Buddha Nagar — On track, declared 2028-11

Rps08/2024

Yamuna Expressway Industrial · Gautam Buddha Nagar — On track, declared 2029-06

Rps09/2025

Yamuna Expressway Industrial · Gautam Buddha Nagar — On track, declared 2030-06

Rps10/2025

Yamuna Expressway Industrial · Gautam Buddha Nagar — On track, declared 2030-09

Rrps -04/2020

Yamuna Expressway Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Rudra Aquacasa

Rudra Buildwell Homes · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Rudra Palace Heights

Rudra Buildwell Projects · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-12

Ryne

Primrose Infratech Ltd · Gautam Buddha Nagar — Past declared deadline, declared 2022-10

SAI Home II

Saidrishti Homes Llp · Gautam Buddha Nagar — Past declared deadline, declared 2018-06

Samajwadi Awas Yojana/ Mukhyamantri Awas Yojana

New Okhla Industrial · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

Samridhi Daksh Avenue

Samridhi Buildmart Private · Gautam Buddha Nagar — On track, declared 2027-11

Samridhi Grand Avenue

Samridhi Realty Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-06

Samridhi Luxuriya Avenue

Samridhi Infra Square · Gautam Buddha Nagar — Past declared deadline, declared 2025-03

Sanchar Arcade Sahkari Awas Samiti LTD

Sanchar Arcade Sahkari · Ghaziabad — Completed · Completion cert on record, declared 2018-07

Sanchar Nest Sahakari Awas Samiti Ltd.

Sanchar Nest Sahakari · Ghaziabad — Completed · Completion cert on record, declared 2019-12

Sangwan Heights

Sangwan Heights Pvt · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Sarvottam City Center

Sarvottam Retails Infra · Ghaziabad — On track, declared 2029-05

Sarvottam Pride

Ksn Buildwell Private · Ghaziabad — Past declared deadline, declared 2021-06

Sarvottam Shree

Sarvottam Realcon Private · Ghaziabad — Past declared deadline, declared 2021-06

Sattyam Complex

Pro Infra Real · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Satyam Galleria

Pro Infrareal Private · Gautam Buddha Nagar — Due soon, declared 2026-10

Saviour Park.

Savfab Buildtech Private · Ghaziabad — Past declared deadline, declared 2018-03

Saviour Park

Savfab Buildtech Private · Ghaziabad — Completed · Completion cert on record, declared 2020-12

Saviour Park

Savfab Buildtech Private · Ghaziabad — Past declared deadline, declared 2023-06

Saviour Street

Saviour Builders Private · Ghaziabad — Past declared deadline, declared 2018-07

Savviour Manoharram

Saviour Infra Private · Gautam Buddha Nagar — On track, declared 2027-12

Sawasdee Centre

Asteroid Shelters Homes · Ghaziabad — Past declared deadline, declared 2025-06

Sawasdee JLG Galleria

Jlg Properties Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-12

Saya Gold Avenue

Saya Homes Pvt · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Saya Gold Avenue

Saya Homes Pvt · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Saya Piazza

Rgb Infra Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-10

Saya South X

Forever Infrabuild India · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

Saya Status

Saya Cementation Limited · Gautam Buddha Nagar — Past declared deadline, declared 2024-11

Saya Zion

Saya Buildcon Consortium · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-06

SCC Blossom Commercial Block, Nursing Home AND Nursery School

Scc Builders Pvt · Ghaziabad — Past declared deadline, declared 2025-11

SCC Blossom PH-1 Block X

Scc Builders Pvt · Ghaziabad — Completed · Completion cert on record, declared 2023-08

SCC Blossom PH-2 Block C AND Block D

Scc Builders Pvt · Ghaziabad — Due soon, declared 2026-09

SCC Blossom Block A AND B

Scc Builders Pvt · Ghaziabad — On track, declared 2029-03

SCC Sapphire PH-2

Scc Builders Pvt · Ghaziabad — Past declared deadline, declared 2021-06

SCC Sapphire PH-II Block - F

Shrine Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2021-06

SCC Sapphire Phase-I Block B,c,d & E

Scc Builders Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Sector-5-Ews/lig

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2018-08

Sector-5-Ews/lig-Phase 02

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2022-06

Sentosa Parc

Royce Promoters Developers · Ghaziabad — Completed · Completion cert on record, declared 2022-06

Sethi Venice Phase I (tower A , B , L , M , Conven

Esthetic Buildtech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-03

SG Benefit

Sg Estates Private · Ghaziabad — Completed · Completion cert on record, declared 2018-09

SG Grand

Sg Estates Private · Ghaziabad — Completed · Completion cert on record, declared 2022-03

SG Oasis

Sg Estates Private · Ghaziabad — Completed · Completion cert on record, declared 2019-03

SG Orchard

Sg Estates Private · Ghaziabad — On track, declared 2031-01

SG Shikhar Height

Perigee Infratech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2025-04

SG Vista

Sg Estates Private · Ghaziabad — On track, declared 2028-08

Shagun City Center

Shagun Mart Llp · Gautam Buddha Nagar — On track, declared 2029-04

Shakti Plaza

And Developers · Ghaziabad — Past declared deadline, declared 2019-12

Shalimar City

Mr Proview Realtech · Ghaziabad — Completed · Completion cert on record, declared 2019-06

Shalimar City

Mr Proview Realtech · Ghaziabad — Completed · Completion cert on record, declared 2023-07

Shalimar City Phase-1

Mr Proview Realtech · Ghaziabad — Past declared deadline, declared 2018-09

Shikhar Enclave

Awas Evam Vikas · Ghaziabad — Completed · Completion cert on record, declared 2017-12

Shipl-Royal Castle-Floors

Suncity Hi-Tech Infrastructures · Ghaziabad — Past declared deadline, declared 2022-05

Shipl-Royal Castle-Plots

Suncity Hi-Tech Infrastructures · Ghaziabad — Past declared deadline, declared 2021-12

Shipra Srishti

Shipra Estate Limited · Ghaziabad — Past declared deadline, declared 2019-12

Shivalik Homes 2

Cosmos Infraestate Pvt · Gautam Buddha Nagar — On track, declared 2028-12

Shivam Plaza

Isp Construction Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-03

Shivoy High Street

Rajvansh Infracon Private · Ghaziabad — Past declared deadline, declared 2026-05

Shouryapuram Residential Floors PH-1

Shouryapuram-Stpl · Ghaziabad — Past declared deadline, declared 2023-06

Shouryapuram Residential Plots PH-1

Shouryapuram-Stpl · Ghaziabad — Past declared deadline, declared 2023-04

Shri Laxmi Celebration Residency

Shri Laxmi Archcon · Ghaziabad — Completed · Completion cert on record, declared 2020-09

Shri Radha Aqua Gardens

Decent Buildwell Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-12

Shri Radha SKY Gardens Phase-1

Sjp Infracon Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-12

Shri Radha SKY Park

Sjp Infracon Limited · Gautam Buddha Nagar — On track, declared 2029-09

Shriram Heights

Rockfort Developers Pvt · Ghaziabad — Past declared deadline, declared 2018-08

Shriram North View Appartments

Rockfort Developers Pvt · Ghaziabad — On track, declared 2027-12

Signature Global Mall

Sarvpriya Securities Private · Ghaziabad — Completed · Completion cert on record, declared 2021-04

Signature Park

Resource Management Consulting · Gautam Buddha Nagar — On track, declared 2029-06

Signature Street

Aditya Durobuild Pvt · Ghaziabad — Completed · Completion cert on record, declared 2019-09

Signature Street

Ghaziabad Infragoal Private · Ghaziabad — Past declared deadline, declared 2024-12

Sikka Kaamna Greens

Kindle Infraheights Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-09

Sikka Kaamya Greens

Eco Green Buildtech · Gautam Buddha Nagar — Past declared deadline, declared 2026-04

Sikka Kannan Greens

Sikka Developers Private · Ghaziabad — Completed · Completion cert on record, declared 2029-05

Sikka Karmic Greens

Promoters Private Limited · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Sikka Karnam Greens

Sikka Infrastructure Pvt · Gautam Buddha Nagar — Due soon, declared 2026-10

Sikka Kimantra Greens

Pinnacle Superstructures Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-04

Silver Homes

Ratandeep Infrastructure Pvt · Ghaziabad — Past declared deadline, declared 2023-06

Singapore Residency

Builtwell Private Limited · Gautam Buddha Nagar — Past declared deadline, declared 2012-12

SKA Arcadia

Kamroop Promoters Llp · Ghaziabad — Completed · Completion cert on record, declared 2027-10

SKA Atlantis

Aarohi Towers Private · Ghaziabad — On track, declared 2031-04

SKA Destiny ONE

Prasu Developers Llp · Gautam Buddha Nagar — On track, declared 2029-01

SKA Divine

Prasu Buildcon Llp · Ghaziabad — On track, declared 2029-08

SKA Divya Towers

Jrs Conbuild Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-09

SKA Estate

Prasu Home Llp · Gautam Buddha Nagar — On track, declared 2030-01

SKA Imperia

Jrs Buildcon Llp · Ghaziabad — On track, declared 2031-03

SKA Metro Ville

Kamroop Infrabuild Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-11

SKA Orion

Provence Developers Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2026-03

Skagreenarch

Prasu Infrabuild Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-09

Skardi Greens - Phase-2

Skardi Realtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2024-09

Skardi Greens-Phase-I

Skardi Realtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-09

Skytech Colours Avenue

Jatasya Promoters Pvt · Gautam Buddha Nagar — On track, declared 2028-08

Smart I

Mng Realtech Llp · Ghaziabad — Due soon, declared 2026-09

Smart Villa

Mng Realtech Llp · Ghaziabad — Past declared deadline, declared 2025-10

Smartworld ES

Blitzbay Developers Private · Gautam Buddha Nagar — On track, declared 2030-10

Sobha Aurum

Sobha · Gautam Buddha Nagar — On track, declared 2030-04

Sobha Rivana

Sobha · Gautam Buddha Nagar — On track, declared 2031-02

Solitairian City - Phase-1

Pary Developers Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-10

Solitairian City - Phase-2

Pary Developers Private · Gautam Buddha Nagar — Past declared deadline, declared 2026-06

Solitairian City - Phase-3

Pary Developers Private · Gautam Buddha Nagar — On track, declared 2028-06

Solitairian City -Phase-1

Solitaire Realinfra Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-03

Solitairian City -Phase-2

Solitaire Realinfra Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Solitairian City -Phase-3

Solitaire Realinfra Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-07

Spectrum Metro

Blue Square Infrastructure · Gautam Buddha Nagar — Past declared deadline, declared 2024-11

Spectrum Metro Block- A AND E

Blue Square Infrastructure · Gautam Buddha Nagar — Past declared deadline, declared 2024-10

Spectrum@metro

Blue Square Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-06

Spectrum@metro

Blue Square Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

Spectrum@metro

Blue Square Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-12

Spectrum@metro

Blue Square Infrastructure · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-06

Speedway Avenue

Pyramid Infratech · Gautam Buddha Nagar — Due soon, declared 2026-07

Speedway Avenue

Pyramid Infratech · Gautam Buddha Nagar — Past declared deadline, declared 2019-02

Spls Aawasiya Yojna

Sdpl Projects Private · Ghaziabad — Past declared deadline, declared 2026-01

Sports Complex

Ametek Buildtech India · Gautam Buddha Nagar — Past declared deadline, declared 2026-04

Sports Village

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Sports Village

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Sports Village

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Sportshome

Devsai Construction Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Sportshome Phase II

Devsai Construction Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-06

Spotlite

Spotlite Projects Private · Ghaziabad — Completed · Completion cert on record, declared 2024-04

Spring Elmas

Sublime Realtech Private · Gautam Buddha Nagar — On track, declared 2029-12

Spring Homes

Clover Probuild Private · Gautam Buddha Nagar — Due soon, declared 2026-12

Spring Meadows

Pigeon Buildhome Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-09

Spring View Heights

Sare Saamag Realty · Ghaziabad — Past declared deadline, declared 2023-12

Srishti

Renowned Buildtech Private · Ghaziabad — Completed · Completion cert on record, declared 2020-12

Star Rameshwaram Phase - II

Star Amd Realcon · Ghaziabad — Past declared deadline, declared 2022-06

Stellar 1422 Phase II

Cta Softech Private · Gautam Buddha Nagar — On track, declared 2028-03

Stellar ONE Phase 1

Stellar Spring Projects · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-09

Stellar ONE Phase II

Stellar Spring Projects · Gautam Buddha Nagar — On track, declared 2028-11

Stellar ONE Phase III

Stellar Spring Projects · Gautam Buddha Nagar — On track, declared 2028-10

Street 45

Raj Lifespace Llp · Ghaziabad — On track, declared 2029-08

Sukh Sagar Complex

Madhav Mukund Promoters · Ghaziabad — Past declared deadline, declared 2020-03

Sunshine Solaris

Golfgreen Residency Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-03

Suntwilight - Commercial

Sunrise Structures Developers · Gautam Buddha Nagar — Past declared deadline, declared 2024-02

Suntwilight - Recreational - Phase - I

Sunrise Structures Developers · Gautam Buddha Nagar — Past declared deadline, declared 2024-02

Suntwilight - Recreational - Phase-II

Sunrise Structures Developers · Gautam Buddha Nagar — Past declared deadline, declared 2025-02

Sunvillas

Himgiri Hotels Private · Ghaziabad — Completed · Completion cert on record, declared 2024-12

Sunworld Arista

Sunworld Residency Private · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Sunworld Arista

Sunworld Residency Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Sunworld Arista, Club

Sunworld Residency Private · Gautam Buddha Nagar — On track, declared 2030-01

Sunworld Vanalika Phase-II

Sunworld Developers Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Supernova Phase-I

Supertech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-06

Supernova Phase-II

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2023-09

Supernova Phase-III

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Supernova Phase-IV

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2023-10

Supertech Capetown

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Supertech Capetown

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2025-03

Supertech Czar

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Supertech ECO Village-3 Phase-3

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-11

Supertech ECO Village-I

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2018-09

Supertech ECO Village-I

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2019-11

Supertech ECO Village-I

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2023-01

Supertech ECO Village-I Phase I-C

Supertech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Supertech ECO Village-II

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-04

Supertech ECO Village-II

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-08

Supertech ECO Village-II

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Supertech ECO Village-II Phase I-C

Supertech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Supertech ECO Village-III

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2019-03

Supertech ECO Village-III

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Supertech Ecociti - Phase-1

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2018-06

Supertech Golf Country

Supertech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-06

Supertech Golf Country

Supertech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Supertech Golf Country

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Supertech Northeye

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Supertech ORB-O AND B

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Supertech ORB-R

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Supertech Upcountry

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

Supertech Upcountry GH-01

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

Supertech Upcountry GH-01 Phase-02

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

Supertech Upcountry GH-02 Phase-01

Supertech · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Surya Appartment-1

Suryansh Buildmart Private · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Sushant Aquapolis, Group Housing, Phase-1

Ansal · Ghaziabad — Past declared deadline, declared 2021-03

Sushant Aquapolis, Group Housing, Phase-2

Ansal · Ghaziabad — Past declared deadline, declared 2022-03

Sushant Aquapolis, Group Housing, Phase-3

Ansal · Ghaziabad — Past declared deadline, declared 2023-03

Sushant Serene Residency PH1 T7b1 & T6D

Ansal · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-09

Sushant Serene Residency PH2 T3e,t4e,t5d

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Sushant Serene Residency Phase 3 Tower 10 & T

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2022-03

Sushant Serene Residency Phase 4 Tower T8B & T12e&

Ansal · Gautam Buddha Nagar — Past declared deadline, declared 2022-09

SVG Central Square

Shri Vinayaka Expo · Gautam Buddha Nagar — On track, declared 2029-04

SVG Galleria

Svg Galleria Private · Gautam Buddha Nagar — Past declared deadline, declared 2023-12

SVG Golf Avenue

Svg Buildech Llp · Gautam Buddha Nagar — On track, declared 2029-04

SVG Hightes

Shrivinayaka Realtech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-07

SVG Townsquare-2

Vinayaka Expo Plaza · Gautam Buddha Nagar — On track, declared 2029-07

Swamanorath

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2021-05

Swarn City Centre

Cleoh Homez Dekorz · Ghaziabad — On track, declared 2028-07

Swarn Plaza

Vinayaka Shopping Complex · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-03

T Homes Phase-1

And Infrazone Pvt · Ghaziabad — Past declared deadline, declared 2024-10

T1, NX ONE

Sai It Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-09

Terminal 21

Galactic City Private · Gautam Buddha Nagar — On track, declared 2030-04

THE Alien Court

Pratham Buildcon Private · Ghaziabad — Past declared deadline, declared 2019-03

THE Aranya Phase 1

Unnati Fortune Holdings · Gautam Buddha Nagar — Past declared deadline, declared 2017-12

THE Aranya Phase 2

Unnati Fortune Holdings · Gautam Buddha Nagar — Past declared deadline, declared 2018-04

THE Arthah

Thapar Builders Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-10

THE Blue

Tandt Infra Builders · Ghaziabad — On track, declared 2027-08

THE Brook Phase-2

Blessings Homz Pvt · Gautam Buddha Nagar — On track, declared 2029-05

THE Brook- Phase 1

Blessings Homz Pvt · Gautam Buddha Nagar — On track, declared 2029-06

THE Core

Concept Capital Infra · Ghaziabad — Past declared deadline, declared 2025-12

THE Downtown

Granite Hill Properties · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

THE Element - Phase -I

In Infraestates Llp · Ghaziabad — On track, declared 2028-03

THE Elysium

Omnis Developers Private · Gautam Buddha Nagar — On track, declared 2028-08

THE Estates

Amit Kumar Tyagi · Ghaziabad — On track, declared 2030-02

THE Express Park View II- LOW Rise Apartments

Iitl-Nimbus The Express · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-01

THE Flagship Phase 1

It Infrastructure Park · Gautam Buddha Nagar — On track, declared 2027-11

THE Flagship Phase 2

It Infrastructure Park · Gautam Buddha Nagar — On track, declared 2027-11

THE Flagship Phase 3

It Infrastructure Park · Gautam Buddha Nagar — On track, declared 2027-11

THE Flagship Phase 4

It Infrastructure Park · Gautam Buddha Nagar — On track, declared 2027-11

THE Flagship Phase 5

It Infrastructure Park · Gautam Buddha Nagar — On track, declared 2027-11

THE G

Gulshan Homes And · Gautam Buddha Nagar — On track, declared 2029-07

THE Golden Gate

Parakh Infrastructure Pvt · Ghaziabad — Completed · Completion cert on record, declared 2024-03

THE Golden Palms

Capital Infraprojects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

THE Golden Palms

Capital Infraprojects Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

THE Golf Address

Implex Infrastructure Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2022-10

THE Golf Street HUB

Gen Estate Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-09

THE Grand Emporio

Shrinath Ji Promoters · Ghaziabad — On track, declared 2031-02

THE Hemisphere_phase-1

Royalgolf Link City · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

THE Hemisphere_phase-1_towers

Royalgolf Link City · Gautam Buddha Nagar — Past declared deadline, declared 2025-11

THE Hemisphere_royalgolf Plaza

Royalgolf Link City · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

THE HUB

Jyotisuper Construction And · Ghaziabad — Past declared deadline, declared 2025-06

THE Iconic Corenthum

Beaver International (India) · Gautam Buddha Nagar — Past declared deadline, declared 2021-12

THE Imperial

Svp Builders India · Ghaziabad — Past declared deadline, declared 2022-01

THE Islands

Gaursons India Private · Gautam Buddha Nagar — On track, declared 2030-04

THE Jewel OF Noida

Homes Infrastructure Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

THE Jewel OF Noida

Homes Infrastructure Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-05

THE Jewel OF Noida - Burj Noida

Homes Infrastructure Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2029-05

THE Jewel OF Noida - Avenues AT Burj Noida

Homes Infrastructure Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2029-05

THE Kutumb

Aapl Projects Private · Ghaziabad — On track, declared 2029-09

THE Merlin

Skg Homes Pvt · Ghaziabad — Completed · Completion cert on record, declared 2018-09

THE Monarque

Green Bay Infrastructure · Gautam Buddha Nagar — On track, declared 2029-09

THE Oasis

Pan Realtors Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

THE Park Street

Iitl-Nimbus The Express · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-09

THE Peridona C-1 Jaypee Greens

Crc Greens Private · Gautam Buddha Nagar — On track, declared 2030-02

THE Resident Tower

Hale Realtors Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2024-10

THE Resort

Agarwal Associates (Promoters) · Ghaziabad — Completed · Completion cert on record, declared 2026-08

THE Rivulet Phase-1

Grand Realtech Limited · Gautam Buddha Nagar — On track, declared 2030-04

THE Romano

Ivr Prime Developers · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

THE Romano

Ivr Prime Developers · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

THE Sapphire

Pavitra Conbuild Private · Ghaziabad — Completed · Completion cert on record, declared 2024-07

THE Sephyra

Imperia · Gautam Buddha Nagar — On track, declared 2028-07

THE Suites AT Godrej Golf Links

Ar Landcraft Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2024-01

THE Sunflower - Phase 1

Au Real Estate · Ghaziabad — On track, declared 2029-02

THE Tempean - Phase 1

Aims Sanya Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-12

THE Tempean - Phase 2

Aims Sanya Developers · Gautam Buddha Nagar — Past declared deadline, declared 2024-03

THE Wonders OF Geek

Mahesha Infravalley Private · Ghaziabad — Due soon, declared 2026-07

TO-DAY

Ama Towers Llp · Gautam Buddha Nagar — Past declared deadline, declared 2020-11

Tower 4

Wegmans Industries Pvt · Gautam Buddha Nagar — On track, declared 2030-12

Towers I AND J

Rajesh Projects (India) · Gautam Buddha Nagar — Past declared deadline, declared 2026-03

Towers K AND L

Rajesh Projects (India) · Gautam Buddha Nagar — Past declared deadline, declared 2025-09

Town Central - Phase-I

Pks Buildmart Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-02

Town Central - Phase-II

Pks Buildmart Private · Gautam Buddha Nagar — Past declared deadline, declared 2025-11

Town Central - Phase-III

Pks Buildmart Private · Gautam Buddha Nagar — Due soon, declared 2026-11

Town Square-1

Mahavinayaka Infraproject Private · Gautam Buddha Nagar — On track, declared 2028-12

Trecento Residences-A

Golf Lake Llp · Gautam Buddha Nagar — On track, declared 2028-07

Trevana Residences

Karyan Buildcon Private · Ghaziabad — On track, declared 2030-12

TRG THE Mall

Trisol Red Developers · Ghaziabad — On track, declared 2030-01

Trident Embassy Phase-1

Trident Infra Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-03

Trident Embassy Phase-2

Trident Infra Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2018-12

Trident Embassy Phase-3

Trident Infra Homes · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-01

Trident Embassy Reso

Trident Infra Homes · Gautam Buddha Nagar — Past declared deadline, declared 2025-12

U:fairia

Maheshwari Infratech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2025-06

Uchdpl- Eden

Uppal Chadha Hi-Tech · Ghaziabad — On track, declared 2029-06

Uchdpl-Dream Homes-GH

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2021-02

Uchdpl-Eligo

Uppal Chadha Hi-Tech · Ghaziabad — Due soon, declared 2027-03

Uchdpl-Samriddhi Homes EWS LIG Group Housing

Uppal Chadha Hi-Tech · Ghaziabad — On track, declared 2029-02

Uchdpl-Sector-1-OAK Wood Enclave- Plots

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Uchdpl-Sector-15-Plots

Uppal Chadha Hi-Tech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-02

Uchdpl-Sector-16-Plots

Uppal Chadha Hi-Tech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-02

Uchdpl-Sector-17-Plots

Uppal Chadha Hi-Tech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-01

Uchdpl-Sector-18-Plots

Uppal Chadha Hi-Tech · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-03

Uchdpl-Sector-2-Plots

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2018-12

Uchdpl-Sector-2-Prime Floors

Uppal Chadha Hi-Tech · Ghaziabad — Past declared deadline, declared 2020-10

Uchdpl-Sector-2-Wave Floors

Uppal Chadha Hi-Tech · Ghaziabad — Past declared deadline, declared 2021-04

Uchdpl-Sector-3-Wave Floors

Uppal Chadha Hi-Tech · Ghaziabad — Past declared deadline, declared 2018-04

Uchdpl-Sector-4-Plots

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2018-07

Uchdpl-Sector-4-Wave Floors

Uppal Chadha Hi-Tech · Ghaziabad — Past declared deadline, declared 2019-06

Uchdpl-Sector-5-Wave Floors

Uppal Chadha Hi-Tech · Ghaziabad — Past declared deadline, declared 2021-04

Uchdpl-Sector-6-Plots

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2019-04

Uchdpl-Sector-7-Plots

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2020-11

Uchdpl-Veridia-3-Oakwood Enclave

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2025-10

Uchdpl-Veridia-4-Oakwood Enclave

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2025-12

Uchdpl-Veridia-5-Oakwood Enclave

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2025-12

Uchdpl-Veridia-6-Oakwood Enclave

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2025-12

Uchdpl-Veridia-7-Oakwood Enclave

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2025-12

Uchdpl-Veridia-Oakwood Enclave

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2024-09

Uchdpl-Wave Executive Floors-GH

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Uchdpl-Wave Galleria-COM

Uppal Chadha Hi-Tech · Ghaziabad — Completed · Completion cert on record, declared 2019-09

Umesh Park Phase-1

Modi Industries Limited · Ghaziabad — On track, declared 2028-05

Unibera Elite 70

Unibera Developers Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2022-01

Unibera Towers

Unibera Developers Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2019-11

Unihomes Phase -1

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2019-06

Unihomes Phase-2

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Unihomes-3

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Uninav Bliss

Uninav Developers Pvt · Ghaziabad — Completed · Completion cert on record, declared 2023-06

Uninav Eden

Uninav Developers Pvt · Ghaziabad — Completed · Completion cert on record, declared 2025-06

Uninav Heights Phase-2

Uninav Developers Pvt · Ghaziabad — Completed · Completion cert on record, declared 2019-05

Uninav Residena

Uninav Buildcon Private · Ghaziabad — On track, declared 2029-10

Uninav Utopia

Uninav Developers Pvt · Ghaziabad — Completed · Completion cert on record, declared 2027-03

Unitech Amber

Unitech Hi-Tech Developers · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Unitech Burgendy

Unitech Hi-Tech Developers · Gautam Buddha Nagar — Past declared deadline, declared 2022-06

Unitech Cascade

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Unitech Exquisite

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Unitech G&H

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Unitech Habitat

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Unitech Residences

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Unitech Willows

Unitech Hi-Tech Developers · Gautam Buddha Nagar — Past declared deadline, declared 2019-07

Universal HUB 2

Galactic City Private · Gautam Buddha Nagar — On track, declared 2027-12

Uniwest Aero HUB

Uniwest Infratech Private · Gautam Buddha Nagar — On track, declared 2028-02

Uniwest HUB

Uniwest Infratech Private · Gautam Buddha Nagar — Due soon, declared 2027-06

Uniworld Garden

Unitech Limited (Mr · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Unnati Fortune World - Phase 1

Ivr Prime It · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Unnati Fortune World - Phase 2

Ivr Prime It · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Urbainia Trinity NX

Avdesh Infotech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Urbainia Trinity NX

Avdesh Infotech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Urbainia Trinity NX

Avdesh Infotech Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-04

Urban Homes Phase 1A

Uh Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2019-03

Urban Homes Phase 1B

Uh Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2022-10

Urban Homes Phase 1C

Uh Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2022-04

Urban Homes Phase 1D

Uh Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2022-10

Urban Homes Phase 2A

Shubhhomes Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2022-10

Urban Homes Phase 2B

Shubhhomes Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2022-10

Urban Homes Phase 2C

Shubhhomes Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2022-10

Urban Royale

Shubhhomes Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2026-03

UTC Softech

Utc Softech Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-07

Utopia Estate

Sai Adhiraaj Land · Ghaziabad — Past declared deadline, declared 2023-12

Vaastu Homes

Envyrons Infrastructure Private · Ghaziabad — On track, declared 2028-12

Vaibhav Heritage Height

Buildtech · Gautam Buddha Nagar — On track, declared 2028-01

Vardhman I Valley

Vardhman Estates Developers · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Varun Heights

Varun Buildtech Pvt · Ghaziabad — Completed · Completion cert on record, declared 2019-06

Vasant Square

Fastech Developers Llp · Ghaziabad — Due soon, declared 2027-05

Vasundhara Grand

Nandini Buildhome Consortium · Ghaziabad — Past declared deadline, declared 2022-12

Vedantam Minaret

Magus Consortium Orchid · Ghaziabad — Completed · Completion cert on record, declared 2022-03

Vedantam Phase 1

Radicon Infrastructure Housing · Gautam Buddha Nagar — Past declared deadline, declared 2018-03

Vedantam Phase-2

Radicon Infrastructure Housing · Gautam Buddha Nagar — Past declared deadline, declared 2018-12

Vedantam Phase-3

Radicon Infrastructure Housing · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Vertex Luxarium Phase I

Vertex Retail Smv · Ghaziabad — Due soon, declared 2026-10

Vertex Luxarium Phase II

Vertex Retail Smv · Ghaziabad — Due soon, declared 2026-10

Vewe Street

Welcome Vertex Infra · Ghaziabad — On track, declared 2027-11

Victory ACE

Dream Procon Private · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

Victoryone Amara

Rudra Buildwell Infra · Gautam Buddha Nagar — On track, declared 2028-08

Victoryone Central

Intellect Projects Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2028-03

Vihaan Golf BAY

Emerald Promoters Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2023-06

Vihaan Greens

Vihaan Developers Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2020-12

Vihaan Shopping Plaza

Bhagwati Contractors · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Vilasaa

Vaikuntam Buildcon Private · Ghaziabad — Completed · Completion cert on record, declared 2027-02

Vrinda Homes -1

Allegiance Conbuild Private · Ghaziabad — Completed · Completion cert on record, declared 2020-05

Vrinda Homes-2

Shubhhomes Realcon Private · Ghaziabad — Completed · Completion cert on record, declared 2025-12

VVD-Bloom

Vanshika Vedant Developers · Ghaziabad — On track, declared 2027-12

Vvip Addresses Greater Noida

Vibhor Vaibhav Infrahome · Gautam Buddha Nagar — On track, declared 2029-09

Vvip Addresses Phase 3

Vibhor Vaibhav Infrahome · Ghaziabad — Completed · Completion cert on record, declared 2018-10

Vvip Asset

Vibhor Vaibhav Infrahome · Ghaziabad — Past declared deadline, declared 2018-12

Vvip Club Studio Apartments

Vibhor Vaibhav Infrahome · Ghaziabad — Past declared deadline, declared 2018-12

Vvip Homes PH 1

Solitaire Infrahome Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-12

Vvip Homes PH 2

Solitaire Infrahome Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2022-09

Vvip Mangal

Vibhor Vaibhav Infrahome · Ghaziabad — Completed · Completion cert on record, declared 2023-09

Vvip Namah

Vvip Ems Infrahome · Ghaziabad — On track, declared 2028-05

Vvip Nest

Vibhor Vaibhav Infrahome · Ghaziabad — Past declared deadline, declared 2023-08

Vvip Niwas

Vibhor Vaibhav Infrahome · Ghaziabad — Completed · Completion cert on record, declared 2024-03

Vvip Yamuna

Vvip Infrahome Private · Gautam Buddha Nagar — On track, declared 2030-10

Wegmans Signature Tower

Wegmans Industries Pvt · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

White House Apartments

Vocational Education Foundation · Gautam Buddha Nagar — Past declared deadline, declared 2019-12

White Orchid

Town Park Buildcon · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Windsor AT Godrej Golf Links

Ar Landcraft Llp · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2023-06

Windsor Majesty

Windsor Paradise Heights · Ghaziabad — On track, declared 2030-02

Windsor Paradise-II

High End Infratech · Ghaziabad — Completed · Completion cert on record, declared 2022-03

Windsor Paradise-II

High End Infratech · Ghaziabad — Completed · Completion cert on record, declared 2021-06

Windsor Paradise-II

High End Infratech · Ghaziabad — Completed · Completion cert on record, declared 2021-09

Windsor Paradise-II

High End Infratech · Ghaziabad — Completed · Completion cert on record, declared 2024-01

Windsor Paradise-II

High End Infratech · Ghaziabad — Completed · Completion cert on record, declared 2022-03

Windsor Premium Tower

Windsor Arrow Infratech · Ghaziabad — Completed · Completion cert on record, declared 2019-03

Winsten Park Phase-1

Skv Infotech Private · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Winsten Park, Phase-II

Skv Infotech Private · Gautam Buddha Nagar — Past declared deadline, declared 2024-11

Winsten Park-III

Skv Infotech Private · Gautam Buddha Nagar — On track, declared 2028-01

Wmcc-2B

Wave Megacity Centre · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2019-07

Wmcc-2D

Wave Megacity Centre · Gautam Buddha Nagar — Past declared deadline, declared 2021-06

Wmcc-3E

Wave Megacity Centre · Gautam Buddha Nagar — Past declared deadline, declared 2020-12

Wopl-Wone

Wave One Private · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2021-12

World OF Taste

Imperia · Gautam Buddha Nagar — Past declared deadline, declared 2020-09

World Residency

Real Anchors Developers · Ghaziabad — Past declared deadline, declared 2020-09

WTC Noida

Wtc Noida Development · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

WTC Noida CBD

Wtc Noida Development · Gautam Buddha Nagar — Past declared deadline, declared 2024-08

WTC Noida- Cubit

Wtc Noida Development · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

WTC Noida- ONE E

Wtc Noida Development · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

WTC Noida- Quad

Wtc Noida Development · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

WTC Noida- Riverside Residences

Spire Techpark Pvt · Gautam Buddha Nagar — Past declared deadline, declared 2025-06

Xt01 Sector-3

Greater Noida Industrial · Gautam Buddha Nagar — Completed · Completion cert on record, declared 2017-12

Yamuna City Mall

Wall Rock Developers · Gautam Buddha Nagar — On track, declared 2027-09

Zoom Arcade

Dbf Infrastructure Pvt · Ghaziabad — On track, declared 2030-06

_iris Tower_ OF Project Cloud 9 Towers

Rishabh Buildwell Pvt · Ghaziabad — Completed · Completion cert on record, declared 2019-06