Project RERA record · Mumbai, Thane & the MMR

Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A2

by Wadhwa Construction And Infrastructure Private Limited · MahaRERA P52000021106 · Certificate Signed · declared completion Dec 2026

Deregistered by MahaRERA

Deregistered by MahaRERA. Raigarh · Wadhwa Wise City

Deregistered by MahaRERA

This project has been deregistered by MahaRERA. Verify the current status of the registration and whether any alternative arrangements exist for existing buyers.

Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A2 has been deregistered by MahaRERA. Existing buyers should verify whether any alternative arrangement — a new registration, court order, or IRP resolution plan — is in place, and confirm the current status directly with MahaRERA.

On the regulator's record

  • 29 quarterly reporting periods on MahaRERA's compliance schedule — 29 flagged for QPR default, currently in default on QPR filings

Source: MahaRERA public project record.

Builder track record

Wadhwa Construction And Infrastructure Private Limited is the promoter on 22 MahaRERA-registered projects, of which 2 carry a regulator flag (insolvency, deregistration, suspension, completion lapse or QPR default). A pattern across a builder's portfolio matters more than any one project's brochure — look into these before you trust this registration:

Other flagged projects by Wadhwa Construction And Infrastructure Privat

Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh
Wadhwa Construction And Infrastructure Private Limited
FlaggedRaigarh

Other RERA-registered projects in Panvel

99 Silver Oaks
Bombay Construction & Infraprojects
Aaditya Lakshmi Narayan
Arvind Mahadev Sawlekar
Aakar Bellisimo
Aakar Construction
Abri Pacific
Abufaiz Rabbani Khan

What to verify (inactive registration)

  1. Download the MahaRERA order stating the reason for deregistration or suspension — this is public on the portal.
  2. Check whether the developer has filed a challenge in the Appellate Tribunal and whether the order is stayed.
  3. Do not make any further payments until the registration status is restored or you obtain legal advice.
  4. Contact MahaRERA's helpdesk for guidance on alternative arrangements or pending dues.

Request the report on Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A2

We analyse Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A2 in full and send you the RERA Property Intelligence Report — we analyse in 1 working day.

Something went wrong — email hello@quietlist.in instead.

Free · Risk Snapshot + alerts

The regulatory risk spine for Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A2, emailed as a clean scorecard — plus an alert if the RERA status changes:

  • 🔴  Deregistered by MahaRERA

Something went wrong — email hello@quietlist.in.

✓ On its way to your inbox — plus alerts if the status changes.

Flags are from MahaRERA's own published problem lists — not a claim about the developer's intent. Explore every flagged project on our Mumbai, Thane & the MMR RERA red-flag register.

Last checked against the RERA register: 11 Jul 2026