Gurgaon HRERA Property Intelligence Report

Independent Floors at Dlf Gardencity Enclave Phase 2

Dlf · SECTOR 93 · HRERA RERA-GRG-1223-2022

Declared completion
30 Oct 2028
Date in the public HRERA project row.
Completion signal
Future date
Declared completion date is still ahead.
Total units
544
Booked
45%
Quarters filed
12
Latest filing
2026 Q1

Decision Summary

Worth a closer look before you commit
Sales tractionMedium
Filing disciplineLow
Delivery timelineMedium
Builder recordLow

A read of HRERA filings already shown below — sales pace, escrow use, filing recency and the builder's local record — not an independent rating or investment advice.

What I'd Do As A Buyer

The shortest version of this report: specific moves, each tied to a filing fact below.

Who This Suits & What To Verify

! Sales have stalled in recent quarters — suited to buyers who will verify demand and the reason for the slowdown before committing.

Use this as a due-diligence map of the HRERA filings: it points to what to ask and verify next, not a substitute for legal review or a site visit.

Questions To Ask The Builder

  1. What is the latest engineer-certified percentage of construction, and can I see the certificate?
  2. What is the current booked-vs-total unit count, and the revised possession date?
  3. Can you show that escrow withdrawals match completed construction milestones?
  4. Is there any HRERA complaint, extension order, or litigation on this project?

What the filing tells you

Synthesis from the HRERA quarterly record — sales pace, escrow use, filing recency and the builder's local delivery record, read the way a sales team won't volunteer.

Unit inventoryThe developer filed 544 apartments in 6 carpet-area configurations spanning 744–862 sq ft of carpet area. That filed carpet area — not the super-built-up the brochure quotes — is what you legally pay for; reconcile the two.
DensityAt a proposed FAR of 2.64 against a permissible 2.64, this project is building close to the permitted ceiling — a dense layout (more units, tighter open space). Density drives daylight, parking and resale supply — weigh it for your floor and unit.
Sales traction245 of 544 units sold, but none in the last four filed quarters — sales have gone quiet. Ask why before assuming demand.
Escrow disciplineAcross 12 filed quarters the developer routed ₹397.62 Cr into and ₹285.68 Cr out of the RERA escrow account, latest balance ₹136.70 Cr. The account is being actively used, which is what you want to see on a building project.
Filing recencyThe most recent quarterly progress report on file is 2026 Q1 (12 filed in total). A developer that keeps filing is one the regulator can still hold to a timeline — silence is the warning sign.
Builder recordDLF has 42 other Gurgaon projects on the register, 31 with an OC on record. Read it as a list to spot a pattern, not a delay rate.

Official Unit Inventory

544 apartments filed across 6 carpet-area configurations, 136 towers, carpet areas from 744 to 862 sq ft. These are the carpet areas the developer filed with HRERA — match the unit a broker quotes you against this table; a "1,650 sq ft" pitch should map to a filed configuration here (carpet area is the RERA-defined saleable floor).

Carpet area(metric)Units of this size
862 sq ft80.0 sq m496
862 sq ft80.0 sq m8
862 sq ft80.0 sq m4
859 sq ft79.8 sq m4
832 sq ft77.3 sq m4
744 sq ft69.1 sq m28

Plot Sizes on Offer

136 plots filed across 6 sizes, from 160 to 179 sq yd (median ~179 sq yd). Plot size drives both the ticket price and resale liquidity — the mid-size band near the median usually has the deepest resale demand, while the largest plots are scarcer and slower to exit. Match any plot a broker quotes you against this filed schedule (plots are sold by area, not carpet).

Plot size(metric)Plots of this size
179 sq yd150 sq m124
179 sq yd150 sq m1
179 sq yd150 sq m2
173 sq yd145 sq m1
172 sq yd144 sq m1
160 sq yd134 sq m7

Land & Density

Project land
5.01 ac
20,277 sq m on the HRERA filing.
Permissible FAR
2.64
Floor-area ratio the licence allows.
FAR proposed
2.64
Developer is using 100% of the ceiling.

At a proposed FAR of 2.64 against a permissible 2.64, this project is built to near the legal ceiling — expect high density (more towers/units, tighter open space). Density shapes daylight, parking pressure and resale supply — worth weighing for the floor/unit you are considering.

Density & Parking

The filing gives carpet area (what you legally own) but not the builder's super-built-up, so the loading/efficiency % isn't in the RERA record — ask the builder for it and check carpet is ≥65% of super-built-up before you sign.

Which Unit to Buy Here

Two flats in the same project can differ 15–20% in liveability and resale for the same price. Here's how to pick the right one — tower, side, floor, facing, position and size — read off the sanctioned plan and the filed inventory. Directional, not surveyed: verify on a site visit.

2 · Which floor

Target the upper-middle floors: high enough to clear street dust, boundary-wall sightlines, mosquitoes and ground-floor privacy/security worries, but below the very top floor (terrace heat and leak risk). Avoid the ground and first floor (dust, noise, privacy, waterlogging in a bad monsoon) unless you specifically want a private-garden unit and accept the trade-offs. Ask which floors are refuge/service floors and skip the flats directly above or below them.

3 · Which facing

Target North, Northeast and East-facing homes — even, glare-free light all day and no direct heat load — the safe pick. Steer clear of South, West and Southwest-facing living rooms and bedrooms — west/south-west take the full 2–7pm summer sun (heat you pay to fight with the AC all year). A west kitchen or utility is fine; a west master isn't. Confirm the exact facing with a compass on site — brochure 'park-facing' isn't a compass reading.

4 · Which flat on the floor

Prefer a corner unit — two or three external walls mean cross-ventilation, light on more than one side, more windows and a resale premium. Avoid the flat that shares a wall with the lift shaft or staircase (vibration, footfall, less privacy) and the one beside the garbage chute or electrical/meter room. Check the units-per-floor-per-lift ratio — more than ~4 flats sharing one lift core means waits and crowding.

5 · Which size, for value

The 2BHK stock is the liquid part of this project — easiest to rent and to exit, so the safest for capital. Plan-profiled units span 744–862 sq ft of enclosed-room area (room-dimension sums off the sanctioned plan — below the filed carpet, which includes internal walls); check the loading (carpet ÷ super-built-up) against your agreement.

If it were my money

I'd target a corner unit on an upper-middle floor, with a north/east-facing living side and in a 2BHK configuration. I'd pass on west/south-west-facing living rooms and bedrooms and anything on the ground/first floor or the top floor.

Plan-derived guidance, not a survey or a vastu consultation — confirm facing, tower distances and floor specifics on site.

Statutory Plans on File

Every core plan is declared on file — ask the builder to show you each one for your tower/unit.

✓ Demarcation Plan✓ Zoning Plan✓ Building Plan✓ Site Plan✓ Floor Plan✓ Apartment Plans✓ Elevation Section

Declared Facilities & Amenities

Facilities the developer committed to in the HRERA filing, with the status declared for each. "Yet to be prepared" against an amenity you are paying a premium for is a fair question to raise.

FacilityDeclared status
Internal Roads And PavementsAs Per Project Report
Water Supply SystemAs Per Project Report
Storm Water DrainageAs Per Project Report
Electricity Supply SystemAs Per Project Report
Sewage Treatment & Garbage DisposalAs Per Project Report
Street LightingAs Per Project Report
Security And Fire FightingAs Per Project Report
Playgrounds And ParksAs Per Project Report
Club House/Community CentreAs Per Project Report
Shopping AreaAs Per Project Report
Renewable Energy SystemAs Per Project Report
SchoolAs Per Project Report
Hospital/DispensaryAs Per Project Report
Any OtherAs Per Project Report
Earth WorksAs Per Project Report
StpAs Per Project Report
UgtAs Per Project Report
Rainwater HarvestingAs Per Project Report
Construction Of Circulation RoadsAs Per Project Report
ParkingAs Per Project Report

Sales Traction, Quarter by Quarter

Units the developer reported booking in each quarterly HRERA filing — the closest public read on real demand.

QuarterUnits bookedTotal units
2023 Q2169544
2023 Q352544
2023 Q47544
2024 Q15544
2024 Q20544
2024 Q37544
2024 Q45544
2025 Q10544
2025 Q20544
2025 Q30544
2025 Q40544
2026 Q10544

Escrow Account Activity

Money moving through the RERA-mandated escrow account each quarter. Withdrawals are meant to fund construction milestones — ask the builder to evidence that they did.

QuarterDepositedWithdrawnBalance
2023 Q2₹59.03 Cr₹0 L₹83.80 Cr
2023 Q3₹41.79 Cr₹33.28 Cr₹92.30 Cr
2023 Q4₹16.39 Cr₹12.69 Cr₹96.00 Cr
2024 Q1₹14.38 Cr₹16.75 Cr₹93.64 Cr
2024 Q2₹28.82 Cr₹31.03 Cr₹91.43 Cr
2024 Q3₹21.23 Cr₹27.36 Cr₹85.30 Cr
2024 Q4₹17.55 Cr₹17.48 Cr₹85.37 Cr
2025 Q1₹43.20 Cr₹13.25 Cr₹115.32 Cr
2025 Q2₹31.33 Cr₹34.00 Cr₹112.65 Cr
2025 Q3₹32.96 Cr₹27.52 Cr₹118.09 Cr
2025 Q4₹35.83 Cr₹16.82 Cr₹137.09 Cr
2026 Q1₹55.11 Cr₹55.50 Cr₹136.70 Cr

Builder Record

DLF has 42 other Gurgaon projects on the HRERA register; 0 are past the declared completion date with no OC yet, 31 delivered. Read it as a spot-check list for a pattern, not a delay rate.

Location & Connectivity

The nearest major job hub is ~6 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
IMT Manesar6 km
Golf Course Road belt17 km
Cyber City / DLF Cyber Hub18 km
Udyog Vihar18 km
IGI Airport, Delhi23 km
Connaught Place, Delhi37 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Request the report on Independent Floors at Dlf Gardencity Enclave Phase 2

We analyse Independent Floors at Dlf Gardencity Enclave Phase 2 in full and send you the RERA Property Intelligence Report — we analyse in 1 working day.

Something went wrong — email hello@quietlist.in instead.